Polyurethane composite material pultrusion production line
A composite material and production line technology, which is applied to the device and coating of the surface coating liquid, can solve the problems of the gap between the profile and the positioning part, the deformation of the positioning part, and the inability to seal the coating liquid, so as to achieve a uniform coating film, The effect of ensuring airtightness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Such as figure 1 and figure 2 , the polyurethane composite material pultrusion production line 1 of the present invention includes a box body 10 for the pultruded composite material A to pass through, a positioning component 20 for limiting the deflection of the pultruded composite material passing through the box body, and a composite The material applies a uniform coating film and forms a seal against the coating liquid. The elastic member 30 and the outer splint 40 undergo elastic deformation when subjected to squeezing force. The elastic member 30 is clamped between the outer splint 40 and the positioning member 20 . The positioning component 20 is positioned outside the box body 10, and the positioning component 20 is preferentially arranged at the exit position of the box body 10, and the elastic component 30 is positioned at the downstream of the positioning component 20, so that the elastic component 30 and the outer splint 40 are also downstream of the exit of...
Embodiment 2
[0039] Such as Figure 7 , the positioning component 20 is arranged inside the box body 10, and the positioning component 20 is integrally formed with the box body 10, and the positioning component 20 is a raised portion, and multiple such raised portions are preferably provided. Since the positioning component 20 is located inside the box body 10 , the elastic component 30 and the outer splint 40 are still disposed outside the box body 10 , and the outer splint 40 is connected to the box body 10 .
[0040] When the positioning part 20 is arranged inside the box body, the first stop arm 10d that controls the deformation of the elastic member is provided in the box body 10, the first stop arm 10d, and the first stop arm 10d is preferentially arranged on the inner wall of the box body 10 and The first blocking arm 10d is located near the outlet of the box body 10 . With this structure, the edge 31 of the elastic member 30 is clamped by the edge of the first clamping plate 41 an...
Embodiment 3
[0042] The positioning part 20 is a combination of Embodiment 1 and Embodiment 2, that is, a part of the positioning part 20 is arranged outside the box body 10 as in Embodiment 1, and another part of the positioning part 20 is arranged on the outside of the box body 10 as in Embodiment 2. internal. With this structure, there is no need to arrange the first stop arm 10d in the box body 1 , and a part of the deformation part 32 is clamped by the second stop arm 23 of the clamping part 44 .
[0043] In addition, the second frame-shaped component may also be in a non-closed state, for example, a notch is opened on the basis of the second frame-shaped component in the first embodiment above.
[0044] In addition, generally, the pultrusion die C is used for pultrusion of polyurethane composite materials, and the formed pultrusion composite material A is cooled by a cooling mechanism located downstream of the pultrusion die C, such as Figure 8 , on the basis of the above-mentioned...