Energy-dissipating composite lining in front of tbm construction and its working method
An energy-dissipating lining technology, applied in shaft lining, tunnel lining, measuring devices, etc., can solve problems affecting construction quality, surrounding rock looseness, surrounding rock deformation, etc., to improve construction efficiency, reduce project cost, shorten the effect of time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039]The invention provides a pre-energy dissipating composite lining for TBM construction and an operation method thereof, which can carry out rapid and timely support after TBM excavation, control the deformation of surrounding rock, thereby reducing the risk of loosening and sliding of surrounding rock, and at the same time reducing The in-situ stress load borne by the lining structure ensures the safe and efficient tunneling of TBM and the safety in tunnel construction and operation.
[0040]In order to make the objectives, technical solutions, and advantages of the present invention clearer, the following further describes the present invention in detail in conjunction with specific embodiments and with reference to the accompanying drawings.
[0041]In the embodiment of the present invention, a pre-energy dissipation composite lining for TBM construction is provided, which combinesFigure 1 to Figure 6As shown, the pre-energy dissipation type composite lining for TBM construction in...