Method for vertical mechanical connection of fabricated shear walls
A mechanical connection and shear wall technology, applied in construction, building structure and other directions, can solve the problems of inconvenient construction quality acceptance, unfavorable seismic performance of shear walls, inconvenient transportation and construction, etc. The effect of increasing stability and connection strength, improving installation and construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] The specific steps of a method for vertical mechanical connection of a prefabricated shear wall involved in this embodiment are carried out as follows:
[0036] S1. Design and splitting of shear wall components
[0037] According to the structural load and the "Code for Design of Prefabricated Concrete Structures", the components of the upper shear wall 1 and the lower shear wall 8 are designed and split, and the vertical connection structure of the upper shear wall 1 and the lower shear wall 8 is determined. The position of the member determines the diameter, spacing and position of the vertical ribs 3 at the bottom of the upper shear wall and the vertical ribs 7 at the top of the lower shear wall;
[0038] S2. Determination of relevant attributes of rigid metal box embedded parts 5
[0039] (1) Positioning of rigid metal box embedded part 5
[0040] Rigid metal box pre-embedded parts 5 are pre-embedded in the lower end of the upper shear wall 1 or the upper end of t...