A shield construction method for a working well passing through a pipe gallery
A construction method and technology for working wells, which are applied in shaft equipment, wellbore lining, earthwork drilling and mining, etc., can solve the problems of poor sealing effect, cumbersome and expensive reinforcement of the receiving end and starting end of shield tunneling, and achieve Accelerate the construction progress, improve the quality of terminal connection, and improve the efficiency obviously.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Such as Figure 9 Described, a kind of shield tunneling construction method of working well through pipe gallery, comprises the following steps:
[0050] a. Determine the center line of the wellhead tunnel in the foundation pit, and install the door connection steel ring 2 at the steel plates reserved for the door at the receiving end and the starting end;
[0051] b. Assemble the straight sleeve 1 in the working well, and connect the two ends of the straight sleeve 1 to the connecting steel ring 2 corresponding to the door after the assembly is completed;
[0052] c. Check the tightness of the straight sleeve 1, set a lateral support 3 outside the cylinder of the straight sleeve 1, set a force transmission frame 4 under the straight sleeve 1, and pour the inner bottom of the straight sleeve 1 Concrete cushion 5, filling muck into the straight sleeve 1 and checking the internal pressure of the straight sleeve 1;
[0053] d. The shield machine excavates in the straight s...