An optimization method for the transmission grid of hydropower clusters considering the long-term horizon
A grid optimization and clustering technology, applied in the power grid field, to achieve the effect of optimizing the design scheme, promoting sustainable development and good long-term adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0117] The preferred embodiment of the present invention provides a method for optimizing the transmission grid of a hydropower cluster considering the prospective level year, figure 1 On the basis of , establish the relevant mathematical model of power and electricity balance and analyze and solve it, obtain the outbound channel scheme library of hydropower cluster, and use the entropy weight method to further screen the alternative library of power transmission scheme, and finally obtain a database that satisfies the safety and stability constraints, Strengthening scheme for sending out grids of hydropower clusters with serious fault checking and channel constraints.
[0118] (1) Set the installed capacity of each power source of the hydropower group in a certain hydropower-enriched area in a flat water year and the expected output P under the joint operation after the connection of the leading reservoir G As shown in Table 1 - the installed capacity and output parameters o...
Embodiment 2
[0138] In this example, on the basis of Example 1, it is further assumed that the load in the hydropower-enriched area increases at a rate of 3% per year, and on the basis of Table 2, the full year of 2020, 2025, 2030 and 2035 in this area is obtained by calculation. Power consumption P D As shown in Table 6 - Annual Electricity Consumption in a Region from 2020 to 2035:
[0139] Table 6 (Unit: MW)
[0140]
[0141] 1) The horizontal prospect year is 2025: in the case that the load increases in 2025 and the installed capacity of each cascade power station remains unchanged, check whether the six power delivery schemes shown in Table 5 still meet the safety and stability constraints and check for serious faults and hard constraints such as channel constraints. The verification results show that the scheme 1, scheme 2, scheme 3 and scheme 4 no longer meet the relevant inspection standards. Therefore, it is necessary to re-establish the channel delivery scheme of the partiti...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com