Train interval adjustment system and adjustment method thereof
An adjustment method and system adjustment technology, applied in automatic systems, transportation center control systems, railway car body components, etc., can solve problems such as backlog of passenger flow at stations, lack of overall consideration, and reduction of stop time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0086] refer to image 3 As shown, assuming that there are 3 trains (1, 2, 3) running on a certain line, there are 4 stations in total (A, B, C, and D stations respectively), the train route is circular and the train runs counterclockwise, and train 1 is located at Between stations D and C, train 2 is located between stations C and D, and train 3 is located between stations A and B, and the four stations are evenly arranged. When an accident or failure occurs, the driving interval is 2 minutes ( The initial travel interval h between train 1 and train 2 2,0 ), 3min (the initial interval time h between train 2 and train 3 3,0 ) and 10min (the initial interval between train 3 and train 1 h 1,0 ).
[0087] Set target driving distance h 0 The planned running time of each section is 2 minutes. The planned running time of the section refers to the planned running time of the train between two adjacent stations, and the running buffer time of the interval between stations. δ ...
Embodiment 2
[0112] refer to Figure 4 As shown in , assuming a sudden failure of a certain train, the driver resumes normal operation after troubleshooting and solving the failure. Figure 4 .
[0113] The ring line represents the line, station codes (A, B, C, D, E, F, G), train numbers (01, 02...09), where train 01 is located between stations A and B, and train 02 is located between stations C and Between stations D, and so on, as shown in the figure, the specific location of each train will not be repeated here.
[0114]Assumed target distance between vehicles h 0 5 minutes, the planned running time of each section is 2 minutes, and the running buffer time of each section δ i 1min, that is, after adjustment, the maximum interval operation time is 3min, the minimum interval operation time is 1min, the planned stop time of each station is 40s, and the stop buffer time of each station ε i is 20s, that is, the maximum stop time of each station after adjustment is 60s, and the min...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com