[0025] see Figure 1-4 , a fast positioning center column structure for a steel structure building, comprising a center column body 1 and a foundation pit 14, a positioning structure 2 is installed at the bottom of the center column body 1, and the positioning structure 2 includes a top plate 3 and a bottom column 4, The middle section of the bottom column 4 is vertically slidably connected to the bottom wall of the center column body 1, and the bottom end of the bottom column 4 is inlaid with a ball 5, and the top of the bottom column 4 is equipped with a sliding column 6, and the sliding column 6 is installed through its top. The spring 7 is vertically slidably connected inside the center column body 1, the sliding column 6 is connected with the top plate 3 through the sleeve 8, and the middle section of the sleeve 8 is installed in the side wall of the center column body 1 through the pin shaft 11, and the top plate 3 and the inner wall of the foundation pit 14 fit, the two...
Embodiment 2
[0029] see Figure 1-6 , a fast positioning center column structure for a steel structure building, comprising a center column body 1 and a foundation pit 14, a positioning structure 2 is installed at the bottom of the center column body 1, and the positioning structure 2 includes a top plate 3 and a bottom column 4, The middle section of the bottom column 4 is vertically slidably connected to the bottom wall of the center column body 1, and the bottom end of the bottom column 4 is inlaid with a ball 5, and the top of the bottom column 4 is equipped with a sliding column 6, and the sliding column 6 is installed through its top. The spring 7 is vertically slidably connected inside the center column body 1, the sliding column 6 is connected with the top plate 3 through the sleeve 8, and the middle section of the sleeve 8 is installed in the side wall of the center column body 1 through the pin shaft 11, and the top plate 3 and the inner wall of the foundation pit 14 fit, the two...