Turnout track lining construction method based on BIM technology

A technology of construction method and construction plan, applied in the direction of track, road, track maintenance, etc., can solve the problems of harsh construction environment on the railway site, complicated construction process of turnout, and no consideration of construction plan, so as to reduce the loss of manpower and materials , Reduce the difficulty of construction organization, improve construction efficiency and accuracy

Inactive Publication Date: 2020-10-16
SHANGHAI UNIV OF ENG SCI
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the BIM technology in the prior art is used in engineering construction. Generally speaking, it is only to make construction animations, and then determine the construction plan at one time, but does not consider that the original construction plan will become unfeasible due to unexpected factors in actual construction.
The construction process of turnout is complex, the operating conditions are relatively strict, and the quality acceptance requirements are also high. Moreover, the construction environment of the railway site is harsh, and uncertain problems are likely to occur during construction. This will not only delay the construction progress, but also increase the construction cost.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Turnout track lining construction method based on BIM technology
  • Turnout track lining construction method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] The present invention will be further described below in combination with specific embodiments. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the teachings of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.

[0051] The construction method of turnouts based on BIM technology, such as figure 1 shown, including the following steps:

[0052] (1) Theoretical modeling;

[0053] Use Revit software for 3D modeling according to the drawings and the surrounding environment of the construction. The 3D modeling content includes sleepers 1, fasteners 5, basic rails 2, rail connecting members 3, guard rails 4, wing rails 6 and frog cent...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a turnout track lining construction method based on a BIM technology. The turnout track lining construction method comprises the steps: (1) carrying out three-dimensional modeling according to a drawing and the surrounding environment; (2) performing construction organization design, and making a construction scheme; (3) carrying out animation production according to the turnout track lining operation process and the construction scheme; (4) performing construction according to the construction scheme determined by the construction simulation animation; (5) monitoringwhether the actual construction condition deviates or not; if no deviation exists, skipping to the step (7); if the deviation exists, pausing the construction and entering the next step, wherein the deviation comprises but is not limited to the following construction conditions: 1, construction period delay caused by substandard operation conditions, influence of natural weather and misoperation of constructors; 2, construction quality dissatisfaction; and 3, improper arrangement of labor organization; (6) performing construction organization design again, and returning to the step (3); and (7) completing construction and filing data. According to the method, the construction efficiency and accuracy are effectively improved.

Description

technical field [0001] The invention belongs to the technical field of railway engineering, and relates to a BIM technology-based construction method for turning a turnout. Background technique [0002] As the weakest part of the track line, the turnout often requires track construction due to lateral displacement or poor direction. [0003] The construction of turnout shifting mainly depends on the use of tools such as track pullers, strings, and steel rulers by technicians, and the cooperation between construction personnel. Generally, the amount of a single channel is about 0-40mm. The construction requirements are fine, and the operating conditions and quality requirements are relatively high. It is easy to cause the construction to fail to meet the requirements because the construction personnel are not familiar with the process or improper operation. [0004] Building information modeling (BIM) technology started relatively late in domestic research, but its applicati...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01B33/00G06F30/13G06F30/20G06Q10/06G06Q50/08G06T13/20G06T17/00
CPCE01B33/00G06Q10/063118G06Q10/06313G06Q50/08G06T13/20G06T17/00G06F30/13G06F30/20
Inventor 何越磊何晨路宏遥李再帏孟晓亮
Owner SHANGHAI UNIV OF ENG SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products