Debugging grid-connected mobile platform and mobile island microgrid debugging platform

A mobile platform and micro-grid technology, applied to AC network circuits, single-network parallel feeding arrangements, wind power generation, etc., can solve problems such as spending 2 months, being unable to debug wind power generation equipment, and unfavorable rapid investment in wind farms

Pending Publication Date: 2020-10-23
XEMC NEW ENERGY
View PDF1 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, if there is no access to the public grid, operations such as commissioning of wind power generation equipment cannot be performed
Moreover, wind farms often have multiple wind power generation equipment. According to the existing system, the commissioning and approval of the next wind power generation equipment can only be carried out after each unit is connected to the public grid and the commissioning approval is completed, which makes the whole cycle take 2 months. time around, does not take advantage of the rapid investment of wind farms, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Debugging grid-connected mobile platform and mobile island microgrid debugging platform
  • Debugging grid-connected mobile platform and mobile island microgrid debugging platform
  • Debugging grid-connected mobile platform and mobile island microgrid debugging platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] Please refer to figure 1 , this embodiment proposes a commissioning grid-connected mobile platform 1, which can be used for early commissioning of wind power generation equipment in the initial stage of construction of an isolated island wind farm when it is not connected to the public power grid. The debugging grid-connected mobile platform 1 will be described in detail below.

[0037] Exemplarily, the debugging grid-connected mobile platform 1 mainly includes a public grid replacement device 10, a power quality management device 20, a management implementation device 30, and a debugging interface 40, and the public grid replacement device 10 is respectively connected to the debugging interface 40 and the governance implementation device 30, The power quality control device 20 is connected to the control implementation device 30 and the public grid replacement device 10 respectively. Wherein, the debugging interface 40 will be used to connect the wind energy generatin...

Embodiment 2

[0056] Please refer to Figure 4 , this embodiment proposes a mobile island microgrid commissioning platform 2 , which is different from the above embodiments in that the commissioning platform will include a built-in microgrid control device 50 . The mobile island microgrid debugging platform 2 will be described in detail below.

[0057] Exemplarily, the mobile island microgrid debugging platform 2 includes: a public grid replacement device 10, a power quality management device 20, a governance implementation device 30, a debugging interface 40, and a microgrid control device 50, and the public grid replacement device 10 is respectively connected and debugged The interface 40 and the management implementation device 30, the power quality management device 20 is connected to the management implementation device 30 and the public grid replacement device 10, wherein the power quality management device 20 includes a filtering module 210 and a monitoring module 220, and the manage...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention provides a debugging grid-connected mobile platform and a mobile island microgrid debugging platform. The debugging grid-connected mobile platform comprises a public power grid substitution device, an electric energy quality treatment device, a treatment implementation device and a debugging interface, wherein the public power grid replacement device is connected with the debugging interface and the governance implementation device, the electric energy quality governance device is connected with the governance implementation device and the public power grid replacement device, and the debugging interface is used for being connected with wind power generation equipment serving as a debugged object. The debugging grid-connected mobile platform is advantaged inthat a movable debugging platform is used for debugging the to-be-grid-connected wind power generation equipment under the condition that the to-be-grid-connected wind power generation equipment is separated from a public power grid, a grid-connected test after the wind power plant boosting main transformer is connected into a power grid is unnecessary, the debugging period of a fan can be shortened, the whole wind power plant construction progress control process is optimized, and economic benefits of a wind power plant are increased.

Description

technical field [0001] The application relates to the technical field of wind turbine power generation, and in particular to a debugging grid-connected mobile platform and a mobile isolated island micro-grid debugging platform. Background technique [0002] During the construction period of a wind farm, it is usually necessary to power on and debug the electromechanical parts or electrical modules of wind power generation equipment such as wind turbines. After the commissioning is completed, the wind power generation equipment can be connected to the grid and generate electricity externally. However, the current dynamic commissioning of wind power generation equipment requires the support of the public main power grid (referred to as the public power grid), that is, after the wind farm is connected to the public power grid, the main transformer needs to perform reverse power transmission to provide the load required by the wind power generation equipment. of electric energy....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/38H02J3/46H02J13/00G01R31/08
CPCG01R31/086H02J3/381H02J3/388H02J3/466H02J13/00032H02J2300/10H02J2300/28Y02E10/76Y02E40/70Y04S10/123
Inventor 乔海祥孙克岭张宇舟方星陈真王志兵
Owner XEMC NEW ENERGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products