Power grid main equipment blackout window period determination method and system

A window period, main equipment technology, applied in information technology support systems, electrical components, circuit devices, etc., can solve the problems of equipment accompanying shutdown, unscientific power grid blackout window period, and power grid security hidden dangers, etc. Stop, reduce power grid security risks, and determine the effect of scientific and reasonable methods

Inactive Publication Date: 2020-11-10
CHINA ELECTRIC POWER RES INST +1
View PDF3 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, the determination of the power outage window period of the power grid is not scientific enough, and the accompanying outage of equipment is serious, and the hidden danger of power grid security caused by maintenance is relatively large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power grid main equipment blackout window period determination method and system
  • Power grid main equipment blackout window period determination method and system
  • Power grid main equipment blackout window period determination method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] figure 1 It is a schematic diagram of the method for determining the power outage window period of the main equipment of the power grid. Such as figure 1 As shown, the present invention provides a method for determining the power outage window period of the main equipment of the power grid. The method includes:

[0033] Step 1: Determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the functions of the power transmission and transformation equipment;

[0034] In this step, the classification types of the function classification include: wind power transmission channel equipment, hydropower transmission channel equipment, photovoltaic transmission channel equipment, nuclear power transmission channel equipment, thermal power transmission channel equipment, cross-regional equipment and those that have an impact on the cross-regional channel capability Equipment, cross-provinc...

Embodiment 2

[0123] Figure 10 It is a schematic diagram of the system structure for determining the power outage window period of the main equipment of the power grid. The system for determining the power outage window period of the main equipment of the power grid includes:

[0124] A determining module, configured to determine the classification type of the function classification of the power transmission and transformation equipment in the power grid according to the functions of the power transmission and transformation equipment;

[0125] A collection module, configured to collect basic data corresponding to the classification type according to the classification type;

[0126] A judging module, configured to determine the blackout window period of the power transmission and transformation equipment according to the basic data;

[0127] The output module is used to output and display the blackout window period.

[0128] Preferably, the classification types of the function classif...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a power grid main equipment blackout window period determination method and system, and the method is characterized in that the method comprises the steps: 1, determining theclassification type of function classification of power transmission and transformation equipment in a power grid according to the functions of the power transmission and transformation equipment; 2,collecting basic data corresponding to the classification type according to the classification type; 3, determining a power-off window period of the power transmission and transformation equipment according to the basic data; 4, outputting and displaying the power-off window period. According to the invention, the corresponding basic data is collected according to the classification type of the function classification of the power transmission and transformation equipment in the power grid, the power-off window period of the power transmission and transformation equipment is determined, outputand displayed according to the basic data, the determination method is scientific and reasonable, the equipment accompanying stop can be reduced, and the potential safety hazard of the power grid caused by maintenance is reduced.

Description

technical field [0001] The invention belongs to the field of electric power system and automation thereof, and in particular relates to a method and system for determining a power outage window period of main equipment of a power grid. Background technique [0002] With the rapid development of the UHV power grid and the large-scale and high proportion of new energy connected to the grid, the grid structure is becoming more and more complex, and it is becoming more and more difficult to arrange power outages for equipment. Power outage planning not only involves power grid security and power balance, but also affects the smooth implementation of UHV construction, municipal relocation, railway construction, and the realization of the national clean energy consumption strategy. The complexity of the power grid and the importance of equipment outages determine that the arrangement of outage plans must be coordinated, scientific and reasonable, and the mode of planning outage pl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/46G06Q10/00G06Q50/06
CPCG06Q10/20G06Q50/06H02J3/472H02J2203/20Y04S10/50
Inventor 杨军峰郑晓雨孙大雁罗志强张加力戴赛张传成
Owner CHINA ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products