High-stability sectional type cast-in-situ bored pile construction method

A bored pile, high stability technology, applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., can solve the problems of ground environment derailment, uneven strength, broken piles, etc., to control construction costs and improve stability and safety, reducing the effect of construction difficulty

Inactive Publication Date: 2020-11-27
李用浩
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Most of the concrete piles are poured in one pour to avoid interruption, otherwise the pile will be broken, which will seriously reduce the strength and quality of the concrete pile. The post-strength is not uniform, and due to the heavy weight of the concrete pile, there is a possibility of derailment from the foundation environment after forming, which will lead to uncontrollable settlement and seriously affect the construction quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High-stability sectional type cast-in-situ bored pile construction method
  • High-stability sectional type cast-in-situ bored pile construction method
  • High-stability sectional type cast-in-situ bored pile construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0043] see figure 1 , a construction method for high-stability segmented bored piles, comprising the following steps:

[0044] S1. Construction personnel, materials and equipment enter the site one after another to level the construction site and determine the hole positions;

[0045] S2, bury the multi-section casing, then install the drilling machine and perform positioning, and then prepare the mud for use;

[0046] S3. The drilling machine starts drilling, injects mud and extracts slag in real time during the process, and cleans the hole after the drilling is completed;

[0047] S4. According to the length of the cast-in-situ pile, select an appropriate number of double-effect monitoring rods 1 and evenly weld them on the bound steel cage, then hang the steel cage vertically into the hole position, and fix it after positioning;

[0048] S5. Concrete is poured in sections with a conduit. The pouring height should reach half of the specified double-effect monitoring rod 1....

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a high-stability sectional type cast-in-situ bored pile construction method, and belongs to the technical field of concrete piles. According to the construction method, innovation can be realized, a sectional pouring mode is adopted, and a double-effect monitoring rod is mounted on a reinforcement cage, and is synchronously pre-buried along with sectional pouring, so that the sedimentation phenomenon of a concrete pipe pile in a foundation environment is effectively improved, along with pouring of concrete, the hydration heat phenomenon of the concrete is utilized for absorbing heat and triggering the anchoring action, high-strength combination with the hole wall is achieved, and meanwhile, the concrete at the upper end and concrete at the lower end are connected, in addition, bending and settlement monitoring can be carried out at the same time when the cast-in-place pile is pre-buried inside the concrete, when bending and settlement happen to the cast-in-placepile, an alarm circuit can be triggered, an alarm signal is sent to the outside, and technicians can take remedial measures in time, so that the stability and the safety of the cast-in-situ bored pile are effectively improved, the construction difficulty is reduced, and the construction cost is controlled.

Description

technical field [0001] The invention relates to the technical field of concrete piles, in particular to a construction method for high-stability segmented bored piles. Background technique [0002] Concrete piles are piles made of concrete (including ordinary reinforced concrete and prestressed concrete). It has the advantages of saving wood and steel, durable, and low cost. It has been widely used in the foundation engineering of hydraulic construction, industrial construction, civil construction and bridges. [0003] Bored cast-in-situ pile refers to the pile hole formed in the foundation soil by means of mechanical drilling, steel pipe extrusion or manual excavation on the project site, and a steel cage is placed in it and concrete is poured into the pile. Different, cast-in-place piles can be divided into several categories such as immersed pipe cast-in-place piles, bored cast-in-place piles and bored cast-in-place piles. [0004] Most of the concrete piles are poured ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/38E02D15/04
CPCE02D5/38E02D15/04E02D2600/30
Inventor 李用浩
Owner 李用浩
Who we serve
  • R&D Engineer