Electric energy meter taking and putting device, manipulator and verification assembly line

A pick-and-place device and electric energy meter technology, which is applied in the direction of manipulators, measuring devices, and measuring electricity, can solve the problems of affecting the manipulator's activity space, not compact enough space layout, and low work efficiency, so as to achieve appearance inspection and withstand voltage test, Improve work efficiency and test efficiency, the effect of work efficiency improvement

Inactive Publication Date: 2020-12-04
ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY +1
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Generally, the verification tray can be equipped with multiple electric energy meters at the same time, and the multiple electric energy meters may be the same single-phase meter or different single-phase meters and multi-phase meters; and the inventor found that the claws currently used to grab the electric energy meter are fixed After the electric energy meter on the verification pallet changes, the corresponding jaws need to be replaced. In fact, the single-phase meter and the multi-phase meter can be verified on the same production line, and the replacement of the gripper leads to low work efficiency; at the same time, the existing The grippers that can grip a variety of electric energy meters are not compact enough in space, and the size is too large, which affects the activity space of the entire manipulator, and the flexibility is relatively poor.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric energy meter taking and putting device, manipulator and verification assembly line
  • Electric energy meter taking and putting device, manipulator and verification assembly line
  • Electric energy meter taking and putting device, manipulator and verification assembly line

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] In an exemplary embodiment of the present invention, reference is made to figure 1 As shown, an electric energy meter pick-and-place device includes a base 1 and at least two sets of jaw assemblies, any jaw assembly includes at least two jaws, and the jaws can move to change the grasping range of the jaw assembly, And at least one jaw of any jaw assembly can be embedded in one side jaw of another jaw assembly close to the jaw.

[0032] Specifically, the clamping jaw assembly includes a first clamping jaw assembly 2 and a second clamping jaw assembly 3 disposed on the base 1, the first clamping jaw assembly 2 is provided with at least one group; the second clamping jaw assembly 3 is provided with at least two groups; and The first jaw assembly 2 and the second jaw assembly 3 are arranged side by side on the same surface of the base 1 .

[0033] Further, in some examples, considering that three single-phase watches or two three-phase watch jaw assemblies can be placed on...

Embodiment 2

[0053] refer to Figure 4 , 5 As shown, in another embodiment of the present invention, the base 1 is also provided with a connector 5, which is used to connect the electric energy meter pick-and-place device with the mechanical arm 7, and the mechanical arm 7 is used to drive the electric energy meter to pick and place. Device movement.

[0054] In the embodiment of the present invention, when the base 1 is a plate-like structure, the connecting member 5 is arranged on the side of the base 1 opposite to the first clamping jaw assembly 2 and the second clamping jaw assembly 3. In this embodiment, the connecting member 5 And the specific structure of the mechanical arm 7 is not limited, for example, the connecting member 5 can be a connecting flange, or an electrical connector, and the interior of the electrical connector is provided with the first driving mechanism 21, the cylinder corresponding to the second driving mechanism 31, and the moving The control wire correspondin...

Embodiment 3

[0057] This embodiment provides a manipulator. The manipulator includes the electric energy meter pick-and-place device described in Embodiment 1 or Embodiment 2 and a mechanical arm 7.

[0058] The electric energy meter pick and place device is connected to the mechanical arm 7 through the connector 5, and the electric energy meter pick and place device is used to clamp the electric energy meter;

[0059] The mechanical arm 7 is used to drive the electric energy meter pick-and-place device to move, so as to complete the loading and unloading of the electric energy meter. The mechanical arm is a multi-degree-of-freedom mechanical arm.

[0060] The manipulator provided by the embodiment of the present invention can be used for loading and unloading of single-phase electric energy meters, and can also be used for loading and unloading of three-phase electric energy meters by setting the above-mentioned electric energy meter pick-and-place device. It has strong versatility and doe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an electric energy meter taking and putting device, a manipulator and a verification assembly line, which solves the problem that only a single electric energy meter can be clamped in the prior art and has the beneficial effects of improving the working efficiency and increasing the flexibility of the taking and putting device. The electric energy meter taking and putting device specifically adopts the scheme that the electric energy meter taking and putting device comprises a base, wherein at least two groups of clamping jaw assemblies are installed on the base, multiple groups of clamping jaw assemblies are installed on the same surface of the base and are arranged side by side, clamping jaws can move so as to change the grabbing range of the clamping jaw assemblies, and any clamping jaw assembly comprises at least two clamping jaws, and the clamping jaw on at least one side of any clamping jaw assembly can be embedded into the clamping jaw, which is close tothe clamping jaw on at least one side of any clamping jaw assembly, on one side of the other clamping jaw assembly.

Description

technical field [0001] The invention relates to the technical field of machinery manufacturing, in particular to an electric energy meter pick-and-place device, a manipulator and a verification assembly line. Background technique [0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art. [0003] After the electric energy meter is produced and assembled, it is generally necessary to perform performance verification. In the verification assembly line, the electric energy meter is generally placed on the verification tray, and the connecting device transports the verification tray containing the electric energy meter between the various verification stations. The electric meter needs to be taken out from the verification tray and placed on the palletizing tray to complete the unloading. [0004] Generally, multiple electric energy meters can be set on the verification tray at the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): B25J15/00B25J15/02B25J15/08G01R35/04G01R31/12G01N21/88
CPCB25J15/0052B25J15/0253B25J15/08G01N21/88G01R31/1227G01R35/04
Inventor 何毓函杜艳王清翟晓卉孙艳玲孙凯张蒙宋家乐邹璐高群石春艳邢宝山秦娇于鲁李莹
Owner ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products