A probabilistic analysis method for gravity dam earthquake risk

A technology of risk probability and analysis method, applied in the field of gravity dam earthquake risk probability analysis, which can solve the problems of low calculation efficiency, reduced calculation workload, and long time consumption.

Active Publication Date: 2021-07-06
SICHUAN UNIV
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a gravity dam earthquake risk probability analysis method, in view of the current gravity dam earthquake risk probability analysis method through numerical simulation to predict the structural failure state, the shortcomings of low calculation efficiency and long time consumption, and optimize the earthquake through correlation analysis The strength parameter, as the input parameter of the artificial neural network, uses the neural network to replace the time-consuming numerical simulation, realizes the rapid prediction of the failure state of the gravity dam, and significantly reduces the calculation workload

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A probabilistic analysis method for gravity dam earthquake risk
  • A probabilistic analysis method for gravity dam earthquake risk
  • A probabilistic analysis method for gravity dam earthquake risk

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0116] The YL hydropower station is located in the southwest of my country. It is a first-class large (1) project. The main task is to generate electricity. The normal storage level of the reservoir is 1332.00m, and the total storage capacity is 760 million m 3 , The power station is equipped with 4 sets of 600MW hydroelectric generating units. The YL hydropower station hub is mainly composed of structures such as barrage dams, power plant buildings, water diversion and tail water systems. The barrage dam is a roller compacted concrete gravity dam with a crest elevation of 1336.00m, a minimum elevation of the foundation surface of 1168.00m, a maximum dam height of 168m, and a crest width of 20m. It is 1:0.75. Adopt the method that the present invention proposes to carry out earthquake risk probability analysis to this gravity dam, concrete implementation steps are as follows:

[0117] 1) From the seismic database of the Pacific Earthquake Engineering Research Center (PEER) i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a gravity dam earthquake risk probability analysis method, specifically comprising the following steps: S1: Gravity dam dynamic finite element analysis and dam failure state discrimination under different earthquake motions; S2: Screening for gravity dam failure state prediction S3: Establish a BP neural network model to quickly predict the failure state of the gravity dam; S4: Select the ground motion records used to predict the failure state of the gravity dam, and calculate the earthquake intensity parameters; S5: Different PGA levels Gravity dam failure probability estimation; S6: draw the gravity dam seismic vulnerability curve; S7: calculate the gravity dam seismic risk probability; S8: evaluate the gravity dam seismic risk according to the calculated seismic risk probability.

Description

technical field [0001] The invention relates to the technical field of gravity dam seismic analysis, in particular to a gravity dam earthquake risk probability analysis method. Background technique [0002] Reservoir dams have multiple functions such as flood control, power generation, irrigation, and water supply, and are important infrastructure for the national economy. Concrete gravity dam (referred to as gravity dam) is one of the commonly used dam types in water conservancy and hydropower projects. Under the action of strong earthquakes, gravity dams may be damaged to varying degrees, which directly threatens the safety and normal operation of the project. Therefore, the seismic risk analysis and assessment of gravity dams in high seismic intensity areas has always been a matter of great concern to the industry and society. The probabilistic analysis of structural seismic risk can simultaneously consider the seismic hazard of the site and the seismic vulnerability of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06N3/04G06N3/08
CPCG06Q10/04G06Q10/0635G06N3/084G06N3/044G06N3/045
Inventor 吴震宇刘丽君李泽发田紫圆卞康
Owner SICHUAN UNIV
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More