Hard rock stratum drilled pile radial grading hole forming construction method and application
A construction method and technology of bored piles, which are applied in the direction of drilling equipment and methods, drill bits, drilling equipment, etc., and can solve the problems of insufficient footage, large investment of manpower, thick sediment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0019] Here, the exemplary embodiments will be described in detail, and the "first" or "second" etc. only mean to distinguish the same kind of components or devices, and do not represent limitations.
[0020] The radially graded hole-forming construction method of hard rock formation bored piles in the embodiment of the present invention comprises the steps of:
[0021] a. Construction preparation, equipped with total station, rotary drilling rig, drill bit and casing. The drill bit includes a barrel drill bit and at least two pick sand bucket drill bits with increasing diameters. The diameter of the barrel drill bit is smaller than the pick pick sand bucket drill bit diameter. ;
[0022] b. To measure and stake out, use a total station to locate the center of the pile and mark it;
[0023] c. Bury the casing and align the center of the casing with the center of the pile;
[0024] e. The barrel drill bit is drilled into the hole, and the rotary drilling rig is equipped with ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com