Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of cost prediction model based on overhead line project

An overhead line and forecasting model technology, applied in market forecasting, neural architecture, neural learning methods, etc., can solve problems such as complex engineering construction environment, uneven construction level of line engineering, and many influencing factors, so as to meet the cost prediction dimension refinement effect

Inactive Publication Date: 2021-05-14
CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, due to the many factors affecting the cost of overhead lines, the complex construction environment, and the uneven level of line engineering construction, there are often large differences in the cost of overhead lines under the same voltage level. As far as engineering is concerned, the sample size of comparable overhead line project cost that can be referred to is small, and it is difficult for relevant reviewers of cost projects to review and estimate project cost based on experience and conventional statistical estimation models

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of cost prediction model based on overhead line project
  • Construction method of cost prediction model based on overhead line project
  • Construction method of cost prediction model based on overhead line project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] The present invention will be described in further detail below in conjunction with accompanying drawing and specific embodiment, facilitate to understand the present invention clearly, but they are not construed as limiting the present invention, only for example, will become clearer and easier to understand by explaining the advantage of the present invention simultaneously .

[0048] Referring to the accompanying drawings, it can be seen that the technical solution adopted in the present invention is: a method for building a cost prediction model based on overhead line engineering, comprising the following steps:

[0049]Step 1: Select the historical cost data of overhead line projects that have been completed and put into operation within 2-3 years for analysis; sort out the factors that affect the cost level of overhead line projects, identify the main factors that affect the cost, and determine the main factors that affect the investment cost;

[0050] Step 2: On ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an overhead line project-based cost prediction model construction method. The method comprises the following steps of: selecting historical cost data of an overhead line project which is completed and put into production within 2-3 years for analysis; on the basis of analyzing main influence factors of overhead line project cost, a data basis is provided for model construction through a principal part analysis method; enabling the training sample data to form a combined prediction model through an algorithm of support vector regression W2 and an algorithm of an artificial neural network W1; if the combined prediction model passes prediction result analysis, obtaining a cost prediction model; in the initial stage of project construction, key factors of a to-be-predicted project are input through the cost prediction model, and a cost prediction value of the project can be obtained. According to the method, the optimized intelligent prediction model is verified, a certain prediction capability is provided for the prediction model of the cost of each sub-item of the new project, and the prediction result is relatively accurate. And the investment prediction work in the project front-end investment plan compilation can be assisted.

Description

technical field [0001] The invention belongs to the field of construction cost prediction model construction of overhead line engineering, and in particular relates to a method for constructing a cost prediction model based on overhead line engineering. Background technique [0002] In the construction of overhead line engineering projects, the management and control of project cost plays a decisive role in the overall project management. Analyzing the level, structural changes, influencing factors and development trends of construction costs to achieve effective control of construction costs is of great significance for rationally verifying transmission costs, improving grid investment benefits, and strengthening project investment management. [0003] However, due to the many factors affecting the cost of overhead lines, the complex construction environment, and the uneven level of line engineering construction, there are often large differences in the cost of overhead lin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q30/02G06K9/62G06N3/04G06N3/08G06Q50/06
CPCG06Q30/0206G06Q30/0283G06N3/08G06Q50/06G06N3/045G06F18/2411
Inventor 丁勇杰许维明李俊卿谢元俊彭云陈东闫振邱辉凌熊建武刘成伟丁锐
Owner CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products