A construction method and technology for rainwater wells, which are applied in water supply installations, waterway systems, drainage structures, etc., can solve problems such as low construction efficiency, waste of time, labor, and difficulty in back planing, and achieve the advantages of convenient construction, low cost, and elimination of impact. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] refer to Figure 1 to Figure 5 , the present invention provides a kind of rainwater well lifting device under the road, the rainwater well comprises the first floor well chamber in the lime soil layer 5 below the road structure layer 4 and in the road structure layer 4 according to the height of each layer from the bottom Multi-layer well chambers built layer by layer or layer by layer, including:
[0039] A prefabricated part used to reserve space for the rising well of the rainwater well.
[0040] refer to figure 1 , as a preferred embodiment of the rainwater well lifting device for the road of the present invention, the prefabricated part is a cylindrical sleeve 1, one side of the cylindrical sleeve 1 is sealed, and the other side is open, and the diameter of the opening 11 is greater than the diameter of the wellhead of the well chamber , the material of the cylindrical sleeve 1 is preferably cast iron, and the thickness is between 3mm and 5mm, so that the shape o...
Embodiment 2
[0048] see Image 6 and combine Figure 1 to Figure 5 , the present invention also provides a construction method for a rainwater well raising device on a road, comprising:
[0049] Step 1, after laying down the rainwater pipeline in the lime soil layer 5 below the road structure layer 4, build the first floor well chamber of the rainwater well to the road structure layer 4 at the position of the rainwater well.
[0050] It should be noted that during road construction, before implementing step 1, it also includes surveying and setting out positioning first. Generally speaking, the rainwater pipes of public pipelines are located in the lime soil layer 5 below the road structure layer 4, and are excavated according to the setting out results. Groove, then proceed to step 1, lower the rainwater pipe and carry out masonry work at the position of the rainwater well. The first layer of the well chamber of the rainwater well is built until the road structure layer 4. In this embodi...