A concrete and concrete surface technology, applied in tunnels, tunnel linings, drainage, etc., can solve problems such as incomplete water seepage treatment of tunnel cracks, crack repair and reinforcement without reinforcement, and failure to solve extrusion effects, so as to improve the overall construction quality , to avoid drainage channel blockage, the effect of simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as figure 1 As shown, this embodiment provides a tunnel inverted arch concrete water seepage crack treatment process, including slit slotting, drilling grouting, drilling water diversion, waterproof and drainage construction, trench sealing and channel drainage inspection process, specifically including the following steps :
[0044] Step 1, construction preparation: Conduct a comprehensive investigation on the inverted arch concrete surface 1, mark the water seepage crack 2, take pictures of it to confirm and draw its floor plan, and mark the water seepage crack 2 found in the investigation with red spray paint;
[0045] Step 2, slit slotting: such as figure 2 As shown, remove the mud and debris on the surface of the seepage crack 2, draw fine lime line marks on both sides of the center line of the seepage crack 2, and use a marble cutting machine to cut out the slit 3, and then use an electric pick along the slit 3 The concrete at the position of the water seepa...