Tunnel front edge support construction method
A construction method and advanced support technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the imperfect problems of weak tunnel crossing, easy collapse of tunnel face and vault cavity, innovation and development of support methods Reduce the number of problems, achieve the effect of reducing the amount of backfilling works, reducing the depth of development, and eliminating voids
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.
[0036] The schematic diagram of the tunnel after the front support construction is as follows: Figure 1 to Figure 4 shown.
[0037] In the tunnel front support construction method described in this embodiment, advance support is provided in the tunnel, and the advance support includes multiple rows of arches 2 and the advance small conduits 5 set corresponding to the arches 2; the arch is a rigid arch, The distance between adjacent arches is 0.4-0.8m. The top of the tunnel 1 is provided with conventional circulating shotcrete 8, and the positions of the first excavation contour line 9 (overexcavation) and the second excavation contour line 10 (little or no overexcavation) from the opening are as follows: figure 1 shown. The front area 3 i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


