Engineering cost evaluation and analysis intelligent management system based on cloud calculation and big data

An intelligent management system and engineering cost technology, which is applied in data processing applications, electrical digital data processing, special data processing applications, etc., can solve the problem that it is difficult to meet the accuracy requirements of steel structure construction project cost evaluation, the evaluation results are poor in rationality, and there is no consideration To avoid the one-sidedness of statistics, reduce the loss and waste of building resources, and improve the accuracy

Active Publication Date: 2021-06-22
深圳市智筑工程咨询有限公司
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] For steel structure construction projects, most of the traditional cost evaluation methods only evaluate the material cost of building components in steel structure construction projects, without considering that steel structure buildings need to weld each building component during the construction process, and the welding area The solder material

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering cost evaluation and analysis intelligent management system based on cloud calculation and big data

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0032] refer to figure 1 As shown, the intelligent management system of engineering cost evaluation and analysis based on cloud computing and big data includes a building component quantity statistics module, a building component type analysis module, a cost database, a building component basic parameter acquisition module, a building component volume statistics module, and a building component welding module. Area quantity statistics module, building componen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an intelligent management system for project cost evaluation and analysis based on cloud calculation and big data. Comprising a building part quantity statistics module, a building part type analysis module, a cost database, a building part basic parameter acquisition module, a building part volume statistics module, a building part welding region quantity statistics module, a building part welding region welding parameter acquisition module, a cost analysis module, a management server and a background display terminal. According to the method, the number of building parts and the number of welding regions existing on the steel structure building engineering are counted, and the part material cost corresponding to each building part, the welding flux material cost corresponding to each welding region and the total manual welding cost are counted, so that the comprehensive cost of the steel structure building engineering is evaluated; the defects of a traditional steel structure building engineering cost evaluation mode are overcome, the accuracy of the evaluation result is improved, and then the steel structure building engineering cost evaluation level is improved.

Description

technical field [0001] The invention belongs to the technical field of engineering cost evaluation, relates to steel structure construction engineering, and specifically relates to an intelligent management system for engineering cost evaluation and analysis based on cloud computing and big data. Background technique [0002] With the vigorous development of my country's construction industry, more and more construction projects are being built in various places. The cost work in the entire construction project is one of the very important tasks, and it is an important part of construction management of construction projects. For the construction of construction projects Construction cost control and construction quality assurance have a great influence and effect. Therefore, it is necessary to evaluate and manage the cost of construction projects. Accurate and reasonable construction cost management can ensure and supervise the rational use of construction funds and prevent c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F16/2458G06Q30/02G06Q50/08
CPCG06F16/2462G06Q30/0206G06Q30/0283G06Q50/08
Inventor 漆会丰朱翠华
Owner 深圳市智筑工程咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products