Double-side synchronous hoisting equipment suitable for after-assembled cantilevers of composite-section segmental beam bridge and construction method

A technology of hoisting equipment and composite section, applied in bridge construction, hoisting equipment braking devices, bridges, etc., can solve the problems of reducing construction efficiency, difficult to carry out beam transport and hoisting work, and increasing construction difficulty, so as to improve turnover efficiency, The lifting process is stable and efficient, and the effect of shortening the construction period

Pending Publication Date: 2021-07-16
SHANGHAI MUNICIPAL ENG DESIGN INST GRP
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In addition, the traditional installation method of the core box girder often uses a large lifting ship in the water or a crane on land under the bridge deck to lift the steel box girder transported to the site, and then lift and assemble it by a bridge erecting machine or hoisting equipment; When the hydrological conditions under the bridge do not meet the parking conditions of large cranes or cranes, it is difficult to carry out the traditional method of beam transportation and hoisting, which increases the difficulty of construction and reduces the construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Double-side synchronous hoisting equipment suitable for after-assembled cantilevers of composite-section segmental beam bridge and construction method
  • Double-side synchronous hoisting equipment suitable for after-assembled cantilevers of composite-section segmental beam bridge and construction method
  • Double-side synchronous hoisting equipment suitable for after-assembled cantilevers of composite-section segmental beam bridge and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and in detail below in conjunction with the accompanying drawings and preferred embodiments, but the protection scope of the present invention is not limited to the following specific embodiments.

[0037] Unless otherwise defined, all technical terms used hereinafter have the same meanings as commonly understood by those skilled in the art. The terminology used herein is only for the purpose of describing specific embodiments, and is not intended to limit the protection scope of the present invention.

[0038] This embodiment adopts the hoisting equipment and construction method shown in the accompanying drawings, which is different from the prior art in that: the hoisting equipment mainly includes a gantry system, an anchor system, a hoisting system and a walking system; the gantry system is fixed to the core through the anchor system For the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses hoisting equipment and a construction method which are suitable for synchronously hoisting prefabricated cantilevers on the two sides of a composite-section segmental beam. The hoisting equipment mainly comprises a gantry system, an anchoring system, a hoisting system and a walking system. The gantry system is fixed to a core longitudinal beam through the anchoring system, the prefabricated cantilevers are hoisted to the two sides of the core longitudinal beam through the hoisting system, after the installation of a pair of cantilevers is completed, anchoring between the hoisting equipment and the core longitudinal beam is relieved, and the hoisting equipment is moved forwards through the bridge deck walking system for hoisting of the next segment. The hoisting equipment can ensure sufficient on-beam beam transportation space, so that the hoisting equipment does not influence subsequent cross-core-longitudinal-beam transportation and assembly when a site lacks parking conditions for a large crane ship or a hoisting crane, the efficiency is improved, and the construction period is shortened.

Description

Technical field: [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a double-sided synchronous hoisting device and a construction method suitable for the post-installation cantilever of a segmental girder bridge with a composite section. Background technique: [0002] In view of the characteristics of the "prefabricated core longitudinal girder" assembled first and the "prefabricated cantilever" assembled later, it is necessary to propose a bridge horizontal segmental prefabricated assembly method with excellent mechanical performance, simple and reasonable structure, and fast and convenient construction, as well as a method suitable for this assembly. The walking hoisting equipment of the method. [0003] At present, the longitudinal splicing technology of prefabricated segmental beams is relatively mature, and most of the hoisting equipment commonly used in engineering is also used for hoisting of longitudinal bridge se...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): B66C19/00B66C5/04B66C1/12B66C9/10B66C9/16B66C9/18E01D21/10E01D2/04
CPCB66C1/12B66C5/04B66C9/10B66C9/16B66C9/18B66C19/00E01D2/04E01D21/10
Inventor 卢永成郭济齐新王猛尚家辉
Owner SHANGHAI MUNICIPAL ENG DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products