Urban planning model generation system and method
A technology for urban planning and model generation, which is applied in special data processing applications, instruments, data processing applications, etc., and can solve problems such as difficult urban ecological planning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] The embodiment is basically as attached figure 1 shown, including:
[0049] The obtaining module is used to obtain preset ecological planning information;
[0050] The building block is used to establish the physical model of urban planning according to the preset ecological planning information, obtain the hard point file according to the physical model; and establish the structural model of urban planning according to the hard point file, and establish the point lines of urban planning in each region according to the structural model submodel;
[0051] The simulation module is used to drive the parameters of each element in the point-line sub-model to change within a preset range, and calculate and solve the parameters to obtain simulation analysis results;
[0052]The design module is used to design the detailed digital models of the point-line sub-models of each region according to the simulation analysis results, decorate the detailed digital models on the corres...
Embodiment 2
[0066] The only difference from Embodiment 1 is that the simulation module also includes a transfer unit, which changes the position and direction of the nodes of the dot-line sub-model to realize that the parameters of each element driven by the virtual actuator change within a preset range, thereby Comes with exploded, cut, zoomed-in and zoomed-out displays of complete point-and-line submodels.
Embodiment 3
[0068] The only difference from Embodiment 2 is that the structure of the physical model is repaired. In this embodiment, the preset ecological planning information includes posture information of pictures such as residential buildings and commercial buildings, for example, information of various postures taken by these pictures; the specific process is as follows: first, sparsely reconstruct the posture information of these pictures, Get the sparse point cloud and the attitude information of the picture; then, save the attitude information of the picture, and re-establish the physical model; then, obtain a snapshot of each picture based on the attitude information of the picture, and form a set of picture pairs, that is, in the reconstruction In the established physical model, the pose information of the sparsely reconstructed picture is used to construct the position of the camera, and the snapshots in the same pose are obtained through the camera. Each picture and the corres...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com