Precise assembly equipment and construction method for mountain tunnel secondary lining steel bars

A technology for steel bars and tunnels, which is applied in the field of precision assembly equipment for second-lined steel bars in mountain tunnels. It can solve the problems of large labor input, difficult quality control, and slow speed, and achieve the effect of preventing falling.

Pending Publication Date: 2021-10-15
CHINA RAILWEY ENG SERVICE CO LTD
View PDF18 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The structure of the existing trolley is simple, and its function is only a movable scaffold. The steel bar binding is mainly to manually send the steel bars on the ground from the side of the trolley to the arch, and use welding or threaded sockets to carry out butt extension of the steel bars, and finally Utilize the elasticity of the steel bar to form a ring on the outside of the trolley
This binding method has problems such as slow speed, difficult quality control, and large labor input.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Precise assembly equipment and construction method for mountain tunnel secondary lining steel bars
  • Precise assembly equipment and construction method for mountain tunnel secondary lining steel bars

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] For convenience of description and those skilled in the art to fully understand the present invention, the following definitions are now proposed:

[0032] The masts include front and rear masts, and the front and rear masts use the following labels: front and rear masts 1, 2; the word "front and back" in the front and rear masts is only used to distinguish the positional relationship between the masts. And the terms "first", "second", "third", "fourth"...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of shield tunnel construction, and relates to precise assembly complete equipment for mountain tunnel secondary lining steel bars. The precise assembly complete equipment comprises a walking assembly, a front portal frame, a rear portal frame and a secondary lining steel bar mounting assembly, wherein the front portal frame and the rear portal frame are mounted on the walking assembly, and the secondary lining steel bar mounting assembly is mounted between the front portal frame and the rear portal frame; the secondary lining steel bar mounting assembly comprises a connecting beam and a first rotating drive, wherein the connecting beam is mounted between the front portal frame and the rear portal frame, and the first rotating drive is mounted on the front portal frame and the rear portal frame and used for driving the connecting beam to rotate around the axis of the connecting beam; a fixing part of a second rotating drive is fixedly mounted on the connecting beam, and a telescopic arm is mounted on a rotating part of the second rotating drive; a taking and placing assembly used for taking and placing the steel bars is mounted at one end of the telescopic arm; and a steel bar mesh is grabbed through the taking and placing assembly, the first rotating drive drives the connecting beam to rotate around the axis of the connecting beam, the telescopic arm rotates around the tunnel axis or the axis parallel to the tunnel axis, the second drive drives the first telescopic arm to rotate to adjust the posture of the steel bar mesh, and positioning and mounting of the steel bar mesh are achieved.

Description

technical field [0001] The invention belongs to the technical field of shield tunnel construction, and in particular relates to a precise assembly equipment for second-lined steel bars of mountain tunnels. Background technique [0002] The secondary lining reinforcement is an important part of the secondary lining support of mountain tunnels, and its binding work is an indispensable and important process in the construction of mountain tunnels. At present, the binding of steel bars for the second lining is generally carried out manually on-site with the help of steel bar benches. The structure of the existing trolley is simple, and its function is only a movable scaffold. The steel bar binding is mainly to manually send the steel bars on the ground from the side of the trolley to the arch, and use welding or threaded sockets to carry out butt extension of the steel bars, and finally Utilize the elasticity of the steel bar to form a ring on the outside of the trolley. This ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/40E21D11/15
CPCE21D11/40E21D11/152Y02E10/20
Inventor 李川林靖武焱林罗杭飞班延军戴亚辉李恒李杰李云黄斌陈可李才洪郭涛马周杨雯雯任治承
Owner CHINA RAILWEY ENG SERVICE CO LTD