Precise assembly equipment and construction method for mountain tunnel secondary lining steel bars
A technology for steel bars and tunnels, which is applied in the field of precision assembly equipment for second-lined steel bars in mountain tunnels. It can solve the problems of large labor input, difficult quality control, and slow speed, and achieve the effect of preventing falling.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0031] For convenience of description and those skilled in the art to fully understand the present invention, the following definitions are now proposed:
[0032] The masts include front and rear masts, and the front and rear masts use the following labels: front and rear masts 1, 2; the word "front and back" in the front and rear masts is only used to distinguish the positional relationship between the masts. And the terms "first", "second", "third", "fourth"...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

