Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of outdoor buried pipe capable of resisting soil settlement

A construction method and technology for buried pipes, which are used in hose connection devices, sewer systems, pipes/pipe joints/pipe fittings, etc., can solve the problems of wasting labor and materials, easy to ignore, etc., to improve flexibility and reduce pipe breaks. problems, and the effect of improving soil settlement resistance

Pending Publication Date: 2021-10-22
WUHAN CONSTR ENG
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Although there are links such as tamping and sand cushioning in the construction process, in actual construction, due to the fact that the construction period is easy to be ignored and the tamping is not in place, the soil subsidence in the later period of one or two years is still very serious, and it is easy to cause cast iron pipes buried in the ground. directly crushed, such as figure 2 As shown, it has to be reworked and repaired, wasting a lot of labor and materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of outdoor buried pipe capable of resisting soil settlement
  • Construction method of outdoor buried pipe capable of resisting soil settlement
  • Construction method of outdoor buried pipe capable of resisting soil settlement

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Such as Figure 3-Figure 9 As shown, the anti-soil settlement outdoor buried pipe of the present invention includes the first cast iron pipe A, the floor-through casing D1, the first duckbill elbow B, the waterproof casing D2, the cast iron telescopic pipe fitting E and its limiting device F, the flexible pipe fitting C, and the improved flange gland of the flexible pipe fitting C. The construction method of the anti-soil subsidence outdoor buried pipe of the present invention comprises the following steps:

[0035] Step 1. Calculate the height of the indoor and outdoor walls that need to be adjusted according to the elevation of the outdoor buried pipe and the height of the cast iron telescopic pipe fittings marked on the drawing. When pre-embedding, adjust the height of the waterproof casing. In the specific embodiment, DN100 is used Take the cast iron pipe as an example, the height of the cast iron telescopic pipe fitting E is about 260mm, and the height difference ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of an outdoor buried pipe capable of resisting soil settlement. The construction method comprises the steps that the elevation of the outdoor buried pipe and the height of a cast iron telescopic pipe fitting are marked; a first cast iron pipe is connected with a first duckbilled elbow and a waterproof sleeve and then is connected with a second duckbilled elbow and a first flexible pipe fitting connector; the first flexible pipe fitting connector is connected with the cast iron telescopic pipe fitting and is provided with a limiting device; the other end of the cast iron telescopic pipe fitting is connected with a second flexible pipe fitting connector; the second flexible pipe fitting connector is connected with a third duckbilled elbow; the other end of the third duckbilled elbow is connected with a third flexible pipe fitting connector; the third flexible pipe fitting connector is connected with a second cast iron pipe; the other end of the second cast iron pipe is connected with a fourth flexible pipe fitting connector; and the fourth flexible pipe fitting connector is connected with a third cast iron pipe, and the other end of the third cast iron pipe is connected into a rain waste water well. According to the construction method, the soil settlement resistance of the outdoor buried cast iron pipe can be greatly improved, and the problem of pipe breakage caused by soil settlement is solved.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction method of an outdoor buried pipe resistant to soil settlement. Background technique [0002] At present, due to the increasing number of large public buildings and more and more energy supply systems, the water supply and drainage system pipes of large public buildings are very rich, and the rainwater wastewater system mostly chooses durable cast iron pipes, which are not only cheap but also corrosion-resistant Strong, after entering the international market in the 1960s, it has been widely recognized and used for a long time in the industry. However, the disadvantages of cast iron pipes are also obvious, such as brittle quality and heavy weight. [0003] The construction principle diagram of the traditional outdoor buried pipe is as follows figure 1 As shown, after reaching the ground along the indoor and outdoor standpipes, the waterproof casing g...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E03F3/06E03F3/04F16L33/28
CPCE03F3/06E03F3/04F16L33/28
Inventor 李生兵杨毅鸥王丽芳廖卫超詹皓淇李雅倩郑婷陈洁胡军陈忠
Owner WUHAN CONSTR ENG