Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction project management system and method

A construction engineering and management system technology, applied in the field of engineering management, can solve problems such as heavy workload, loss, damage, etc., and achieve the effect of ensuring system operation safety, solving data lag, and realizing effectiveness

Pending Publication Date: 2021-10-22
华航环境发展有限公司
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, due to the use of paper documents for archiving, when looking for key information of the project, manual review and verification are required, the workload is heavy, key information is easily missed, information relevance cannot be found, and there are problems such as data security; at the same time, paper-based Project archives are affected by the environment, and there are problems such as damage, loss, and falsification, which are not conducive to the confirmation and accountability of construction project quality problems; in addition, with the expansion of scale and business expansion, thousands of pages of engineering contracts are printed, Stamping, mailing and other processes affect the efficiency and security of business

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction project management system and method
  • Construction project management system and method
  • Construction project management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] For ease of understanding, the construction project management system and method provided by the embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0056] An embodiment of the present invention provides a construction project management system, such as figure 1 As shown, it includes: a blockchain service module, which can be used to provide management services for construction project participants;

[0057] Digital signature module, the digital signature module can be used to input the official seal and non-official seal of each participant, open the digital signature permission according to the user authority, and ensure that the person in charge of each link can use the digital signature to add the document in the process of approving the document Affix an electronic seal, and the electronic document with the affixed seal has the same legal effect, ensuring the legitimacy of electronic document appro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction project management system and method, relates to the technical field of project management, and can collect construction project full-life-cycle basic data, establish a digital file of a project, realize online supervision, electronic examination and approval sealing, and rapid searching and positioning under large-scale files, and realize multi-party sharing of data through accurate authorization. Specifically, a blockchain service module is used for providing a management service for a construction project participant; a digital signature module is used for inputting an official seal and a non-official seal of each participant, opening a digital signature permission according to a user permission, and ensuring that a responsible person in each link can use the digital signature to stamp an electronic seal on the file in the file approval process; meanwhile, the system provides encryption security, and the use security and the storage security of the digital signature are guaranteed; and a big data service module is used for collecting and summarizing data resources of each stage of the construction project to form a unified data resource pool, and providing data access, data storage, data management, data calculation and data sharing services.

Description

technical field [0001] The invention relates to the technical field of engineering management, in particular to a construction engineering management system and method. Background technique [0002] Over the past 30 years of reform and opening up, my country's urban construction has made great achievements. The quality level of construction projects has been steadily improved, engineering quality accidents have been effectively curbed on the whole, a large number of "high, deep, large, and difficult" major projects have made major breakthroughs in quality, and project quality management has achieved remarkable results. [0003] In order to strengthen the implementation of lifelong responsibility for project quality, a series of policy documents propose to fully perform quality management responsibilities, improve the project quality management system, and emphasize that project quality should run through the entire process of construction project planning, design, bidding, c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H04L9/32G06Q10/06H04L29/06H04L29/08
CPCH04L9/3247H04L67/06H04L67/10H04L63/08H04L63/10H04L63/123H04L63/1408H04L63/20H04L9/3263H04L9/3297H04L67/02G06Q10/063H04L9/50
Inventor 景泽涛李保民王保菊孙博超周坤田园园
Owner 华航环境发展有限公司