Subway vehicle unfavorable geology CFG pile foundation treatment construction method
A technology of foundation treatment and construction method, which is applied in basic structure engineering, sheet pile wall, building and other directions, can solve the problems of long construction period and cumbersome removal of pile heads, etc., to improve construction efficiency, shorten construction period, and achieve simple operation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The following is attached Figure 1-6 The application is described in further detail.
[0042] The embodiment of the present application discloses a construction method for treating the foundation of subway vehicles with bad geology CFG piles, combining Figure 1 to Figure 3 , including the following steps:
[0043] S1. Measurement and setting out:
[0044] According to the drawing, the control point and axis are used to position and set out the line, measure and release the specific position of each CFG pile 1, drive it into the ground to a certain depth with a steel pipe, and after pulling it out, put in lime, and use the center of the lime hole as the center of the pile.
[0045] S2. The drilling rig is in place and the hole is drilled:
[0046]After the CFG pile drilling rig is in place, correct the position so that the drill pipe is vertically aligned with the center of the pile position, and mark the drilling depth with red paint on the side of the frame next t...