Hydropower station AGC control device script scheduling calculation method
A technology for scheduling calculation and control devices, which is applied in the direction of program control devices, program control design, calculation, etc., can solve the problems of high coupling degree, slow response rate, and inability to meet the rapid frequency modulation and peak regulation response of hydropower units, etc., to meet the requirements, The effect of improving the adjustment rate, improving the response rate and scalability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 As shown, the present invention provides a script scheduling calculation method for AGC control devices of hydropower stations, comprising the following steps:
[0035] The script calculation scheduler built in the AGC control device schedules and calculates the script according to the script calculation strategy;
[0036] The script calculation scheduler judges whether the calculation result has changed, if not, ends the calculation of the current script, and scans the next script;
[0037] If so, the script calculation scheduler judges whether the current script has associated scripts, if not, ends the calculation of the current script, and scans the next script;
[0038] If yes, bring all associated scripts of the current script into the above steps until all scripts in the script file and associated script scheduling calculations are completed.
[0039] The script file in this embodiment is generated by visual editing based on the UI interface of ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

