Construction method for layered construction hole forming of rock-socketed secant pile in riprap area near sea
A technology of layered construction and construction method, which is applied in the direction of drilling equipment and methods, excavation, sheet pile walls, etc., can solve the problems of collapsed hole construction period and difficulty of hole-forming construction, etc., to save construction period, good economic benefits, Guaranteed uninterrupted performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0062] This specific embodiment is only an explanation of the present invention, and it is not a limitation of the present invention. Those skilled in the art can make modifications to this embodiment without creative contribution as required after reading this specification, but as long as they are within the rights of the present invention All claims are protected by patent law.
[0063] Such as figure 1 As shown, a construction method for layered construction of rock-socketed occlusal piles in the coastal riprap area to form holes, including the following steps:
[0064] S1, measuring and setting out in the construction area;
[0065] S2, divide the construction area into construction sections, and carry out guide wall construction;
[0066] S3, pile hole positioning and pile position retesting; drilling rig and sleeve installation;
[0067] S4, the sleeve is pressed into the sand layer from the ground, soil is taken from the inner cavity of the sleeve, and holes are for...