Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for layered construction hole forming of rock-socketed secant pile in riprap area near sea

A technology of layered construction and construction method, which is applied in the direction of drilling equipment and methods, excavation, sheet pile walls, etc., can solve the problems of collapsed hole construction period and difficulty of hole-forming construction, etc., to save construction period, good economic benefits, Guaranteed uninterrupted performance

Active Publication Date: 2021-11-30
CHINA CONSTR EIGHTH ENG DIV
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

b class="d_n">[0004] In order to solve the technical problems that the above riprap area near the sea is difficult to construct holes and is easily affected by the tidal water level, safety issues such as hole collapse affect the construction period, the invention provides a kind of riprap near the sea Construction method of layered construction of rock-socketed occlusal piles to form holes

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for layered construction hole forming of rock-socketed secant pile in riprap area near sea
  • Construction method for layered construction hole forming of rock-socketed secant pile in riprap area near sea

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0062] This specific embodiment is only an explanation of the present invention, and it is not a limitation of the present invention. Those skilled in the art can make modifications to this embodiment without creative contribution as required after reading this specification, but as long as they are within the rights of the present invention All claims are protected by patent law.

[0063] Such as figure 1 As shown, a construction method for layered construction of rock-socketed occlusal piles in the coastal riprap area to form holes, including the following steps:

[0064] S1, measuring and setting out in the construction area;

[0065] S2, divide the construction area into construction sections, and carry out guide wall construction;

[0066] S3, pile hole positioning and pile position retesting; drilling rig and sleeve installation;

[0067] S4, the sleeve is pressed into the sand layer from the ground, soil is taken from the inner cavity of the sleeve, and holes are for...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Diameteraaaaaaaaaa
Lengthaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method for layered construction hole forming of a rock-socketed secant pile in a riprap area near sea, and relates to the technical field of secant pile construction. According to the construction method, a sleeve is matched with a full-rotary drilling machine to drive the sleeve to rotate and follow up, a sand layer, a full-weathering layer, a strong-weathering layer and other soft soil layers adopt a rotary drilling cutting tooth drill bit to take soil, a riprap layer adopts a heavy hammer, a punching grab bucket and a cone cylinder drill to cooperate with punching to take rock, a medium-weathering layer, a micro-weathering layer and other hard soil layers adopt a rotary drilling matched with the cone cylinder drill to carry out hole forming construction, the full sleeve follows up to a rock layer in the construction process, and after a pile hole is finished, a guide pipe is adopted to carry out underwater concrete pouring method construction. According to the construction method, the influence of the tidal water level on the pile hole is solved, meanwhile, the technical difficulty that the formed hole penetrates through the riprap layer is solved, the construction method can be suitable for secant pile construction of a complex stratum, quicksand or sludge in the pile hole is effectively prevented, the construction is safe and rapid, the construction quality of the secant pile is guaranteed, and meanwhile, the construction period can be shortened.

Description

technical field [0001] The invention relates to the technical field of occlusal pile construction, in particular to a construction method for forming holes by layered construction of rock-socketed occlusal piles in a riprap area near the sea. Background technique [0002] The occlusal pile row pile is a support form applied to foundation pit support. Because it has two functions of support and water-stop, it has good integrity, high rigidity, and strong ability to control the deformation of the foundation pit. The construction is harmful to the surrounding buildings. Because of the advantages of small physical impact, it is widely used. The traditional occlusal pile construction technology is suitable for all geological conditions except large rock formations, especially suitable for unfavorable formations with rich groundwater, and the effect is excellent. [0003] For seaside areas containing large pieces of rubble or riprap, the stratum is more complex, affected by vario...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D17/04E02D19/12E02D5/34E02D15/06E21B3/00E21B27/00E21B49/02
CPCE02D17/04E02D19/12E02D5/34E02D15/06E21B3/00E21B27/00E21B49/02Y02A10/23
Inventor 包桂波郭成伟申庆赟刘永涛顾耀文
Owner CHINA CONSTR EIGHTH ENG DIV