Saturated annual load prediction method, system and device based on urban and rural control regulations and medium
A load forecasting and regulation technology, applied in forecasting, information technology support systems, instruments, etc., can solve the problems of long working effect and low accuracy of saturated annual load forecasting, so as to improve the accuracy, popularize the application value, improve the accuracy and The effect of applicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Such as figure 1 As shown, the present invention provides a saturated annual load forecasting method based on urban and rural control regulations, comprising the following steps:
[0059] Step 1: Obtain basic data;
[0060] Obtain the regulatory detailed planning file in CAD or SHP format for the planning area, and convert it into a map layer for grid GIS control planning.
[0061] Step 1 specifically includes the following steps:
[0062] Step 11: Obtain regulatory detailed planning documents in CAD or SHP format for the planning area, including land use name, land use type, and floor area ratio.
[0063] Step 12: Extract and convert CAD or SHP format control planning land and coordinate information to generate a map layer for grid GIS control planning, based on the map layer to achieve color rendering of different types of land use lists, land use attributes and geographical distribution display.
[0064] Step 2: Division of power supply partitions;
[0065] Step ...
Embodiment 2
[0092] Such as figure 2 As shown, the present invention also provides a saturated annual load forecasting system based on urban and rural control regulations, including:
[0093] The basic data acquisition module is used to obtain the regulatory detailed planning documents in CAD or SHP format of the planning area, and convert them into map layers for grid GIS control planning;
[0094] A power supply partition division module, configured to divide the power supply partition into a power supply area, a power supply grid, and a power supply unit;
[0095] The data analysis and calculation module is used to measure and calculate the saturated load of the planned land based on the area of the planned land, the volume ratio, and the saturated load density, and consider the simultaneous rate, and superimpose and calculate the saturated load of the power supply unit, the power grid, and the power supply area;
[0096] The saturated load forecasting module is used to establish a ...
Embodiment 3
[0098] The present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and operable on the processor, wherein the computer program is implemented when the processor executes the computer program. Example 1 describes a saturated annual load forecasting method based on urban and rural control regulations.