Intelligent parameter analysis method and system for multifunctional comprehensive tester of rod-pumped well
A comprehensive tester and pumping well technology, which is applied in earthwork drilling, construction, etc., can solve the problems of reducing the efficiency of intelligent parameter analysis, taking a long time for abnormal parameters, and the accuracy of measurement parameters being easily disturbed by noise, so as to improve operation safety Sexuality, improving scientificity, and improving the effect of accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 As shown, the embodiment of the present application provides an intelligent analysis method for the parameters of the pumping well multifunctional comprehensive tester, wherein the method includes:
[0031] S100: Obtain a first test parameter set of the pumping unit well according to the first comprehensive tester, wherein the first test parameter set includes a plurality of test parameters;
[0032] S200: Construct a first parameter docking model according to the attribute knowledge model of the pumping well;
[0033] Specifically, the first comprehensive tester is any multifunctional tester for pumping wells, through which multiple parameters of pumping wells can be measured to obtain the first set of test parameters, Including liquid level position, bottom hole pressure and other parameters. The attributes of the pumping well are analyzed, and an attribute knowledge model of the pumping well is constructed based on the historical test data of the p...
Embodiment 2
[0081] Based on the same inventive concept as the parameter intelligent analysis method of a pumping well multifunctional comprehensive tester in the foregoing embodiment, as Figure 8 As shown, the embodiment of the present application provides an intelligent analysis system for the parameters of the pumping well multifunctional comprehensive tester, wherein the system includes:
[0082] The first obtaining unit 11, the first obtaining unit 11 is used to obtain the first test parameter set of the pumping unit well according to the first comprehensive tester, wherein the first test parameter set includes a plurality of test parameters;
[0083] The first construction unit 12, the first construction unit 12 is used to construct the first parameter docking model according to the attribute knowledge model of the pumping well;
[0084] A second obtaining unit 13, the second obtaining unit 13 is configured to obtain a first preset analysis target, wherein the first preset analysis ...