A construction method and modular technology, applied in basic structure engineering, design optimization/simulation, processing of building materials, etc., can solve the problems of long construction period and high cost of coke oven foundation roof, save construction time interval, reduce Investment in cost, effect of ensuring position accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] The BIM-based coke oven foundation roof modular construction method of the present invention comprises the following steps.
[0033] a. According to the design drawings of the coke oven, establish the BIM model of the coke oven foundation, divide the coke oven foundation roof in the BIM model, and divide the coke oven foundation roof into several roof modules 1 along its length direction. There is a gap between the two roof modules 1 .
[0034] The size of the roof module 1 is determined according to the hoisting capacity of the hoisting equipment available on the construction site, the dividing line avoids the position of all pipe fittings, and the size of each roof module 1 should be basically consistent.
[0035] The gap between two adjacent roof modules 1 is generally less than 100 mm, and can also be adjusted according to actual conditions.
[0036] b. In the BIM model, determine the number and position of the cleaning holes and lower nozzles contained in each roo...