Layered grouting reinforcement method for ballast track bed frost boiling and mud pumping treatment
A technology of grouting and grouting and grouting reinforcement, which is applied to ballast layers, roads, tracks, etc., can solve problems such as poor economy, grout leakage, and difficulty in meeting the maintenance time of skylights
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] The present invention provides a layered grouting reinforcement method for a ballasted track subgrade bed 3, which includes:
[0061] Step 1. Drill 15cm deep grouting holes on the surface of the foundation bed. The diameter of the drill bit is 30mm, and the diameter of the grouting holes is 32mm. Mud-blooming area 4.
[0062] Step 2. Insert the grouting pipe 5 with a grouting hole at the end into the grouting hole, and install the lower end of the grouting pipe 5 at 13 cm below the ballast bed by means of hammering force;
[0063] Step 3. Control the pressure and start grouting. The grouting material is the surface rapid hardening grouting material. Control the initial grouting pressure to 0.4MPa, then increase it by 0.2MPa every 5min, and finally stabilize the grouting pressure at 1.0MPa. The control grouting rhythm is 20s and 5s stop, while monitoring the change of rail surface elevation, taking the rail surface elevation change of 0.2mm as the signal to stop groutin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


