Concrete pole with climbing function
A technology of cement poles and functions, applied in ladders, building types, buildings, etc., can solve problems such as low safety performance, safety accidents, and lack of protective functions, and achieve the effect of facilitating maintenance and preventing outsiders from climbing.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] see Figure 1-Figure 6 As shown, a cement pole with a climbing function includes a cement pole 1, a wire frame 2, a control box 21, a fixed frame 3, a climbing mechanism 4 and a protection mechanism 5, and the upper part of the cement pole 1 is welded with three The wire frame 2, the lower part of the cement pole 1 is provided with a fixed frame 3, the cement pole 1 is provided with a climbing mechanism 4, the climbing mechanism 4 is used for the staff to climb, and the fixed frame 3 and the climbing mechanism 4 are arranged There is a protection mechanism 5, and the protection mechanism 5 is used to protect the staff.
[0041] When the circuit on the cement pole 1 needs to be repaired, the staff presses the main power switch to energize the whole device, and then the staff buckles the protection mechanism 5 on the body, and then slowly rotates the protection mechanism 5 to assist the staff in climbing. The climbing mechanism 4 climbs up to the upper part of the cement...
Embodiment 2
[0043] see image 3 As shown, on the basis of Embodiment 1, the climbing mechanism 4 includes a fixed sleeve 41, a first fixed rod 42 and a connecting rod 43, and four fixed sleeves are evenly spaced on the cement pole 1 and connected by screws. 41. A first fixing rod 42 is arranged between the four fixing sleeves 41. Three fixing rings are arranged in the middle of the first fixing rod 42. The cement pole 1 is located in the fixing ring. Three connecting rods 43 are welded on the upper part of the first fixing rod 42 , the connecting rod 43 is used for staff to climb, the connecting rod 43 is provided with a rubber ring, and the bottom of the first fixed rod 42 is provided with four connecting rods 43 .
[0044] When it is necessary to maintain the line on the cement pole 1, the staff climbs up to the top of the cement pole 1 by stepping on the connecting rod 43 and the fixing ring to maintain the cables on the wire frame 2. After the maintenance is completed, the staff By s...
Embodiment 3
[0048] see Figure 7 As shown, on the basis of Embodiment 2, a placement mechanism 6 is also included. The placement mechanism 6 is used to place maintenance tools. The placement mechanism 6 includes a second fixed block 61, a rotating rod 62, a placement plate 63, a second fixed Rod 64, the first full gear 65, the first bevel gear 66 and the second full gear 67, a second fixed block 61 is welded on the left side of the upper wire frame 2, and a rotating rod 62 is arranged on the second fixed block 61 in a rotating manner. Rotating rod 62 is provided with placing dish 63, and placing dish 63 is a square, and first frame 51 left side rotation type is provided with second fixed rod 64, and the left side key of second fixed rod 64 is connected with the first full gear 65, rotates The front end of the rod 62 is keyed to the left end of the second fixed rod 64 with a first bevel gear 66, and the two first bevel gears 66 are meshed with each other. The output shaft on the left side ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com