Ecological pedestrian mud-bound road and construction method thereof
A construction method and ecological technology, applied in the field of ecological pedestrian mud road and its construction, can solve the problems of non-wearability of the road surface, easy to dust and muddy on sunny days, etc., so as to reduce water accumulation, improve water seepage capacity, and improve comfort. degree of effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0097] This embodiment has been applied to the ecological restoration project on Guangyang Island, and the construction method of the ecological pedestrian mud road provided includes the following steps:
[0098] Step a: Stake out at the position where the road channel is to be formed; Excavate, ram and compact the position where the road channel is to be formed according to the stakeout, to form the road channel;
[0099] Step b: laying the graded crushed stone evenly in the road groove; compacting the graded crushed stone in the road groove; spraying the diluted liquid curing agent on the surface of the rolled graded crushed stone several times, The dosage is suitable for the surface of the graded gravel to be wet, and the water in the liquid curing agent on the surface of the graded gravel is fully infiltrated (it is better not to stick to the feet), and the base of the graded gravel is obtained;
[0100] Step c: Mix the raw materials of the sand surface layer evenly. Durin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


