The utility model discloses a pre-splitting blasting device for mine blasting, which belongs to the technical field of pre-splitting blasting devices and comprises an energy gathering
pipe, an inner end, an outer end, a plurality of positioning support frames and a plurality of supporting rods, the inner wall of the energy gathering
pipe is provided with a V-shaped groove, an energy gathering hole is arranged in the V-shaped groove, a material blocking thin strip is arranged in the V-shaped groove, the inner end is provided with a plurality of positioning support frames, and the positioning support frames are attached to the wall of a blasting hole after being expanded. And a positioning
frustum is connected to the energy-gathering
pipe and is used for fixing the outer end of the energy-gathering pipe. According to the technical scheme, the positioning supporting frame can be unfolded and folded through rotation, when the energy gathering pipe is inserted into the blast hole, the whole positioning supporting frame is extruded to be in a folded state, smooth
insertion of the energy gathering pipe can be facilitated, after
insertion is completed, the positioning supporting frame can automatically bounce outwards to be in contact with the hole wall, and the supporting and positioning effects on the energy gathering pipe are achieved; the requirement for the drilling precision of the blasting hole is low, in addition, the material blocking thin strips can play a blocking role when explosives are injected, the explosives are prevented from leaking out through the energy gathering hole, and smooth operation of explosive injection work is facilitated.