Directional joint-cutting and fracturing roof main roadway scour-preventing and roadway-protecting method and safe mining method
A technology of fracturing and cutting, which is applied to ground mining, mining equipment, mining equipment, etc., and can solve the problem of insufficient consideration of the dual needs of roadway protection and anti-scouring, the large amount of engineering work for roadway maintenance, and the small range of pressure relief protection belts. To achieve the effects of controlling high-energy vibration and impact risk, creating economic benefits, and solving the limited cracking range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0075] A specific embodiment of the present invention discloses a roadway protection method for directional slit fracturing of the roof. Starting from the conditions and main controlling factors of deformation and failure of the roadway affected by mining and rock burst, it is proposed to adopt The technical method of roof directional fracture fracturing blocks the transmission path of mining stress, improves the surrounding rock stress state of the roadway, and forms double-layer fracturing cracks around the roadway (facing the mining side) through the cooperation of long and short fracturing holes , to achieve the purpose of pressure relief roadway protection. First determine the scope of fracturing protection, and then determine the fracturing timing. On the basis of analyzing the rock formation structure in the fracturing area, determine the key parameters such as fracturing horizon, fracturing hole depth, and fracturing angle; on this basis, design the long-term , short f...
Embodiment 2
[0166] Yet another specific embodiment of the present invention discloses a safe mining method capable of realizing safe mining in coal mines, comprising the following steps:
[0167] Step S1: Design the reserved width of the uphill anti-scouring coal pillar in the fully mining area on both sides;
[0168] Step S2: Carry out excavation according to the designed reserved width of the anti-scouring coal pillar, and perform directional fracturing and fracturing of the roof according to the method of directional fracturing and fracturing roof roadway anti-erosion protection in Embodiment 1 after mining.
[0169] Specifically, the reserved width of anti-scouring coal pillars in the mining area on both sides is designed in the mining area / belt area design stage; the mining area / belt area main road / uphill Excavation; After the layout of the mining area / belt area is completed, the equipment installation is completed on the working face in the mining area / belt area, and in the process ...
PUM
Property | Measurement | Unit |
---|---|---|
The average thickness | aaaaa | aaaaa |
The average thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com