Planting base material for vegetation recovery of slag yard and vegetation recovery construction method of planting base material
A technology of vegetation restoration and construction method, which is applied in planting substrates, botanical equipment and methods, infrastructure engineering, etc., can solve the problems of difficult vegetation restoration and slope instability, so as to reduce restoration difficulty and ensure installation stability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] (1) Grading platform 8 construction: the slope of exposed slope 1 is 70°, the height of grading platform 8 is 10m, and the width is 3m, and the slope of exposed slope 1 after leveling is 40°;
[0049] (2) The parts by weight of planting soil, humus, water-retaining agent, binder and compound fertilizer are: 80 parts of planting soil, 3 parts of humus and 35 parts of compound fertilizer, wherein, 120 parts of peat soil, 80 parts of cement clinker, According to the area of the slag field to be restored, the addition of water-retaining agent and adhesive is 15g / m 3 and 5g / m 3 ;
[0050] (3) The foam stabilizer is selected from carboxymethyl starch. According to the area of the slag field to be restored, the addition of the foaming agent and the foam stabilizer is 6g / m3 3 and 10g / m 3 ;
[0051] (4) The seeding thickness of the planting substrate 7 is 10 cm.
Embodiment 2
[0053] (1) Construction of the graded platform 8: the slope of the exposed slope 1 is 76.3°, the height of the graded platform 8 is 12m, the width is 4m, and the slope of the exposed slope 1 after leveling is 38°;
[0054] (2) The parts by weight of planting soil, humus, water-retaining agent, binder and compound fertilizer are: 83 parts of planting soil, 4.5 parts of humus and 38 parts of compound fertilizer, wherein, 133 parts of peat soil, 86 parts of cement clinker, Based on the area of the slag field to be restored, the addition of water-retaining agent and adhesive is 17g / m 3 and 6g / m 3 ;
[0055] (3) The foam stabilizer is selected from carboxymethyl starch. According to the area of the slag field to be restored, the addition of the foaming agent and the foam stabilizer is 7.3g / m3 3 and 12g / m 3 ;
[0056] (4) The seeding thickness of the planting substrate 7 is 12 cm.
Embodiment 3
[0058] (1) Construction of graded platform 8: the slope of exposed slope 1 is 81°, the height of graded platform 8 is 15m, and the width is 4m, and the slope of exposed slope 1 after smoothing is 33°;
[0059] (2) The parts by weight of planting soil, humus, water-retaining agent, binder and compound fertilizer are: 84 parts of planting soil, 6 parts of humus and 42 parts of compound fertilizer, wherein, 145 parts of peat soil, 92 parts of cement clinker, Based on the area of the slag field to be restored, the addition of water-retaining agent and adhesive is 14g / m 3 and 6g / m 3 ;
[0060] (3) The foam stabilizer is selected from carboxymethyl starch. According to the area of the slag field to be restored, the addition of foaming agent and foam stabilizer is 8.6g / m3 3 and 13.8g / m 3 ;
[0061] (4) The seeding thickness of the planting substrate 7 is 16 cm.
PUM
Property | Measurement | Unit |
---|---|---|
Density | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Slope | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com