Fabricated pipe jacking working well construction method
A construction method and technology for working wells, which are applied in well sinking, earthwork drilling, and vertical shaft equipment, etc., can solve the problems that working wells cannot provide reaction force by jacking pipes.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0033] see figure 1 , the construction method of the fabricated pipe jacking working well provided by the present invention will now be described. The construction method of the prefabricated pipe jacking working well, including:
[0034] Excavate the foundation pit, fix the clamping block at the bottom of the foundation pit, and drill a plurality of anchor rods on the side wall of the foundation pit.
[0035] The reaction wall is hoisted into the foundation pit and the reaction wall is installed on the clamping block so that the tops of multiple anchor rods all ...