Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction route approval system and method for pipeline engineering

A pipeline engineering and routing technology, applied in character and pattern recognition, instruments, other database browsing/visualization, etc., can solve the problems of untimely, time-consuming, labor-intensive, inability to meet high-quality, high-efficiency, etc., and achieve paperless Storage and management, saving test time and cost

Pending Publication Date: 2022-05-27
PIPECHINA SOUTH CHINA CO +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction of oil and gas pipeline projects, the construction project department needs to manage various construction site data such as construction progress, construction quality, and construction materials. At present, it still relies on tables or emails for management and statistics. Problems that are not delivered in time, when analyzing on-site problems, it is necessary to obtain a large amount of data from different channels to make decisions, which is time-consuming and labor-intensive
At the same time, during the construction process, the construction unit often conducts on-site construction guidance and management through drawings, and the communication and transmission efficiency of complex and intertwined construction procedures through drawings can no longer meet the current requirements of high-quality and high-efficiency engineering construction.
[0003] In the construction of pipeline projects, relying solely on traditional experienced personnel to manually carry out pipe trench excavation tests, it is difficult to quickly measure whether the pipeline projects implemented by the construction unit meet the specifications, standards, and quality of the previous design. Notify and rectify problems in a timely manner
There are many time-consuming and large errors in the test

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction route approval system and method for pipeline engineering
  • Construction route approval system and method for pipeline engineering
  • Construction route approval system and method for pipeline engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] Hereinafter, the pipeline engineering-to-construction routing approval system of the present invention will be described in detail with reference to exemplary embodiments. Herein, "first", "second", etc. are only for the convenience of description and distinction, and should not be construed as indicating or implying relative importance or having a strict sequence.

[0038] The embodiment of the present invention is applicable to the generation of the center line of the oil and gas pipeline engineering, and the execution body of the method may be a computer device, including but not limited to a server, a terminal, and the like. Exemplarily, the terminal includes, but is not limited to, a smart phone, a tablet computer, a notebook computer or a desktop computer, and the like.

[0039]According to the embodiments of the present invention, the latest information technology and UAV technology are fully utilized, and the UAV is used as an aerial photography platform to quic...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction route approval system and method for pipeline engineering, and the system comprises a data obtaining module which is configured to obtain an early-stage field image, a later-stage field image and space coordinates, and the space coordinates comprise latitude, longitude and elevation data; the modeling module is configured to construct an original landform three-dimensional model and a pipe trench excavation three-dimensional model according to the original landform image data, the pipe trench excavation image data and the elevation data; and the data processing platform is configured to match the original landform three-dimensional model and the pipe trench excavation three-dimensional model according to space coordinates, screen out trench body positions, identify trench body edges, determine trench bottom boundary coordinates, calculate and generate an actual pipe trench center line, compare the actual pipe trench center line with a design center line, and determine the pipe trench excavation three-dimensional model according to the design center line. And the deviation between the actual pipe ditch center line and the design center line is determined. According to the invention, the construction route of the pipeline project can be approved.

Description

technical field [0001] The invention relates to the field of pipeline engineering construction, in particular, to a pipeline engineering-to-construction routing approval system and a pipeline engineering-to-construction routing verification method. Background technique [0002] In the construction of oil and gas pipeline projects, the construction project department needs to manage various construction site data such as construction progress, construction quality, construction materials, etc. At present, it still relies on forms or emails for management and statistics. For problems that cannot be delivered in time, it is necessary to obtain a large amount of data from different channels to make decisions when analyzing on-site problems, which is time-consuming and labor-intensive. At the same time, during the construction process, the construction unit often conducts on-site construction guidance and management through drawings, and the communication and transmission efficie...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06V20/17G06V20/40G06V20/56G06T17/05G06T7/13G06T7/68G06F16/9537G06F16/904
CPCG06T17/05G06T7/13G06T7/68G06F16/9537G06F16/904
Inventor 周剑琴杨国晖杨旸周鑫彭睿
Owner PIPECHINA SOUTH CHINA CO
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More