Waste mask modified asphalt suitable for long-life pavement and preparation method of waste mask modified asphalt
A modified asphalt and long-life technology, which is applied in the field of building materials, can solve the problems of waste of resources and insufficient use of organic polymers, and achieve the effects of saving resources, achieving sustainable development, and simple preparation processes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] A modified bitumen of waste masks suitable for long-life pavement, comprising the following components by weight: 83 parts of base asphalt, 6 parts of waste masks, 7 parts of basalt fiber, 2 parts of rich aromatic oil, styrene-butadiene - 2 parts of styrene block copolymer.
[0038] The preparation method of the waste mask modified asphalt suitable for long-life pavement is as follows:
[0039] 1. Add the waste masks to the pulverizer and pass through a 20-mesh sieve to obtain a modifier of waste mask powder.
[0040] 2. The obtained waste mask powder is mixed into the base asphalt according to the predetermined mixing ratio, and mixed with the binder in the predetermined ratio, and then placed in an oven at 160 ° C, and taken out after 30 minutes of development.
[0041] 3. Incorporate a predetermined proportion of reinforcing agent, and use a high-speed shearing instrument to shear at a speed of 3000r / min within a temperature range of 160°C for 30min.
[0042] 4. Th...
Embodiment 2
[0044] A modified asphalt for waste masks suitable for long-life pavement, which is composed of the following components by weight: 77 parts of base asphalt, 9 parts of waste masks, 8 parts of volcanic rock fibers, 3 parts of rich rubber oil, polystyrene butadiene 3 parts of copolymer.
[0045] The preparation method of the waste mask modified asphalt suitable for long-life pavement is as follows:
[0046] 1. Add the waste masks into the pulverizer and pass through a 25-mesh sieve to obtain a modifier of waste mask powder.
[0047] 2. The obtained waste mask powder is mixed into the base asphalt according to the predetermined mixing ratio, and mixed with the binder in the predetermined ratio, and then put into an oven at 170 ° C, and taken out after 40 minutes of development.
[0048] 3. Incorporate a predetermined proportion of reinforcing agent, and use a high-speed shearing instrument to shear at a speed of 3500r / min for 40min in the temperature range of 170℃.
[0049] 4. T...
Embodiment 3
[0051] A modified bitumen of waste masks suitable for long-life pavement, which is composed of the following components by weight: 71 parts of base asphalt, 12 parts of waste masks, 9 parts of dolomite fiber, 4 parts of rich aromatic oil, styrene-butanediol 4 parts of ene-styrene block copolymer.
[0052] The preparation method of the waste mask modified asphalt suitable for long-life pavement is as follows:
[0053] 1. Add the waste masks into the pulverizer and pass through a 30-mesh sieve to obtain a modifier of waste mask powder.
[0054] 2. The obtained waste mask powder is mixed into the base asphalt according to the predetermined mixing ratio, and mixed with the binder in the predetermined ratio, and then placed in an oven at 180 ° C, and taken out after 50 minutes of development.
[0055] 3. Incorporate a predetermined proportion of reinforcing agent, and use a high-speed shearing instrument to shear at a speed of 4000r / min for 50min in the temperature range of 180℃. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
