Multi-well-point linkage dewatering construction method for large basement in water-rich sandy soil area
A construction method and basement technology, applied in general water supply conservation, infrastructure engineering, construction, etc., can solve the problems of drainage pipes affecting construction, affecting the construction quality of basement projects, and drainage pipe ruptures, etc., to maximize economic benefits and save costs , Guarantee the effect of construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
[0022] see Figure 1-2 , the present invention provides a technical solution: a construction method for multi-well point linkage dewatering in a large basement in a water-rich sandy soil area, the specific operations are as follows:
[0023] Step 1: According to the geological survey report, through calculation, set up a certain number of sand-proof soil loss tube wells and dewatering wells on the back-casting belt of the basement fl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

