Leader cockpit system control method based on BIM intelligent construction site

A control method and cockpit technology, applied in the field of leading cockpit systems, can solve problems such as construction site confusion, troublesome laying of lines, and easy damage, so as to improve practicability, ensure stability and speed, and improve rigorous performance Effect

Pending Publication Date: 2022-07-12
河北深保投资发展有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. During the use of the existing BIM smart construction site-based leadership cockpit system control method, the wired network is used to transmit data. However, due to the complexity of the construction site, the laying of lines is more troublesome and the construction site is chaotic and easily damaged, resulting in data Unable to transmit in time
[0004] 2. During the use of the existing leadership cockpit system control method based on BIM smart construction site, the cockpit system cannot display the comparison information between the existing construction site status and the standard construction site status, which reduces the practicability of the system
[0005] 3. During the use of the existing control method of the leadership cockpit system based on BIM smart construction site, although the transmission data in the cockpit system is monitored in real time, the abnormal data generated during the monitoring process cannot be effectively communicated to the staff Early warning, reducing the rigor of the system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The leading cockpit system control method based on BIM smart construction site, it includes the following steps:

[0025] Step 1: The cockpit system architecture is divided into three layers, namely: "terminal layer", "access layer" and "wall display system", and "access layer" can be further divided into "platform layer" and "Application Layer";

[0026] Step 2: The "terminal layer" can make full use of IoT technology and mobile applications to improve on-site management and control capabilities;

[0027] Step 3: The information collected by the "terminal layer" is transmitted to the "access layer" through the signal transmitter laid on the construction site using 5G signal transmission and WLAN technology, which can ensure the stability and speed of data transmission.

[0028] Step 4: The "platform layer" in the "access layer" can efficiently calculate, store and provide services through the cloud platform, allowing all parties involved in the project to access data ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a leader cockpit system control method based on a BIM intelligent construction site, and the method comprises the following steps: 1, a cockpit system architecture is divided into three layers, namely a terminal layer, an access layer and a wall display system, and the access layer can be divided into a platform layer and an application layer; the system has the beneficial effects that the signal transmitter laid on the construction site is adopted, so that the system can transmit a 5G signal to an access layer by using a WLAN (Wireless Local Area Network) technology, and the stability and rapidness of data transmission can be ensured; according to the system, the comparison module is arranged in the cockpit system, the existing construction site state can be compared with the standard construction site state through the comparison module, the comparison result is displayed through the wall display system, a user of the cockpit system can further master the construction site conveniently, and the practicability of the system is improved.

Description

technical field [0001] The invention relates to the technical field of a leadership cockpit system, in particular to a control method of a leadership cockpit system based on a BIM smart construction site. Background technique [0002] Management Cockpit is an indicator analysis system for internal leaders and related executives. Break data isolation and realize indicator analysis and decision-making scenarios. Through a detailed indicator system, the operation status of the enterprise is reflected in real time, and the collected data is visualized, visualized and concreted. The "management cockpit" fully integrates the essence of human brain science, management science and information science. The core, from the decision-making environment of managers, the definition of comprehensive indicators of enterprise management, and the presentation of information, all revolve around the purpose of stimulating people's intelligence, facilitating thinking coherence and effective thin...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): H04Q9/00H04W4/38G08B21/00G08B5/36G16Y10/30G16Y10/80G16Y20/00G16Y40/10G16Y40/20G16Y40/35
CPCH04Q9/00H04W4/38G08B21/00G08B5/36G16Y10/30G16Y10/80G16Y20/00G16Y40/10G16Y40/20G16Y40/35H04Q2209/40Y02P90/02
Inventor 轩阳刘玉建高荣华盛全国张龙亮孔涛姚涵斌吉新超杜喆王以安
Owner 河北深保投资发展有限公司