Downhole control pressure casing drilling method containing formation injection pressure

A technology for injecting pressure and pressure casing, applied in drilling equipment and methods, drilling equipment, wellbore/well components, etc. problems, to shorten the drilling cycle, reduce blowout and leakage drilling accidents, and simplify the drilling process.

Pending Publication Date: 2022-07-19
DAQING PETROLEUM ADMINISTRATION +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) Drilling and shutting down has a great impact on production: due to the scattered distribution of renewal wells, pressure reduction (so-called "drilling and shutting") is required during conventional drilling. 40 water (inflow) wells are concerned in the scope on average, and the impact time is about 35 days. Conventional drilling of a renewal well affects a large amount of oil, and causes a large change in pressure in the local well area, which is not conducive to casing protection
[0004] (2) Drilling and shutting down of renewal wells affects the development effect of tertiary oil recovery: According to the requirements of the oil displacement plan, in order to ensure the development effect of the tertiary recovery and injection accumulation block, continuous injection is required during the injection cycle, which makes the casing damaged wells in the tertiary oil recovery block It cannot be updated in time, and the local well pattern is not perfect for injection and production; if the renewal well is a tertiary production well pattern, and it is updated after waiting for a cycle, the reserves in the renewal well area have not been effectively produced during the tertiary oil recovery process, and it is impossible to carry out another three production wells. Oil recovery; if drilling and shutting down is used to reduce pressure, the slug in the accumulation area will be loosened, which will affect the development effect and benefits of the tertiary production
[0005] (3) Non-drilling and shutting down will have a great impact on drilling safety and cementing quality under conventional drilling conditions: it may be difficult to determine the local ultra-high pressure of formation static pressure, and there may be superimposed risks such as shallow gas in some blocks
[0006] At present, in view of the above-mentioned geological conditions, in order to ensure drilling safety and cementing quality, conventional drilling of renewal wells is completed under the condition of drilling shut-down wells, and it is difficult to drill renewal wells without drilling shut-down wells

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] The present invention is further described below:

[0016] A method for controlling pressure casing drilling for downhole containing formation injection pressure, comprising the following steps:

[0017] (1) Once drilling, once cementing, after the first cementing, drill the plug with the roller cone bit and continue to drill for a certain footage, such as 5-10m, then install the managed pressure drilling equipment and debug the managed pressure drilling equipment , pressure test, carry out joint debugging, and start construction after the test run is normal.

[0018] (2) For drilling in the non-oil zone of the second opening, select the hydraulic pressurized anti-slope tool, open and close the hydraulic pressurized anti-slope tool through the top drive, test and record the riser pressure and pump displacement during the process, so as to judge Whether the tool is normal, determine whether the tool is free and the pressure of the fluid through the tool is normal.

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a control pressure casing drilling method for underground containing formation injection pressure. The problems that the yield and the three-production development effect are affected during drilling, closing and updating of an existing three-production casing damage well, and drilling safety is affected when drilling and closing are not conducted are mainly solved. The method is characterized by comprising the steps of drilling a well, cementing the well, installing pressure control drilling equipment and testing pressure; secondly, drilling a well in a non-oil-layer section, testing a hydraulic pressurizing anti-deviation tool, and recording the pressure of a vertical pipe and the pump displacement in the process; drilling in a second-opening casing drilling section, and performing second-opening well cementation; and logging. By the adoption of the drilling method for the control pressure casing pipe containing the formation injection pressure underground, a renewal well can be drilled under the condition that the well is not stopped, the injection-production relation of a casing damage well group can be completed in time, injection of a drilling area is not affected, and the normal block development effect is guaranteed.

Description

technical field [0001] The invention relates to the field of oil fields, in particular to a pressure-controlled casing drilling method for downhole containing formation injection pressure. Background technique [0002] After years of oilfield development, the number of wells with casing damage problems in the third production block is increasing. According to the production capacity construction needs of the third mining block, more and more wells need to be drilled and updated. However, conventional drilling of newer wells has the following problems: [0003] (1) Drilling passes have a great impact on production: due to the scattered distribution of update wells, pressure reduction is required during conventional drilling (the so-called "drilling pass"). On average, there are 40 water (inlet) wells in the scope, and the impact time is about 35 days. Conventional drilling of one renewal well affects the oil volume and causes large pressure changes in the local well area, w...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21B7/00E21B33/13E21B21/08E21B47/06E21B47/008E21B7/20
CPCE21B7/00E21B33/13E21B21/08E21B47/06E21B7/20
Inventor 刘玉民王洪星杨智光王洪卫季海军齐悦张振华贾维君杨决算何俊才朱焱李吉军孙中昌王立哲马晓伟王连生杨秀天陈绍云杨瑞明王永福豁达董岩耿建卫姜玉芳董明田玉栋那自强
Owner DAQING PETROLEUM ADMINISTRATION
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products