Steel trestle double-wall steel cofferdam transportation and rapid assembling and lowering construction method
A double-wall steel cofferdam and construction method technology, applied in the direction of bridges, bridge construction, bridge forms, etc., can solve the manufacturing cost of large-scale ship machinery equipment, high leasing costs, difficulty in realizing the plane transportation of the entire large-scale cofferdam, and complicated construction process and other problems, to achieve the effect of improving accuracy and convenience, wide operating space and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] The present invention will be described in further detail below in conjunction with specific embodiments.
[0046] A steel trestle double-walled steel cofferdam transportation and quick assembly and lowering construction method. First, the double-walled steel cofferdam wall is completed by prefabricating in blocks, and at the same time, the steel casing used for pile foundation construction is lengthened. Then erect the steel cofferdam assembly bracket, lowering bracket and lowering system. The lower two sections of steel cofferdam are assembled in blocks as the bottom section cofferdam, and then the steel cofferdam is lowered to self-floating on the water surface using the lowering system, and then the third section of the cofferdam is raised. In this embodiment, the steel trestle bridge is set up in advance as the water construction access road and the construction platform, and the steel trestle bridge surrounds the construction area of the cap. The cap contains 1...