Building roofing parting seams water-proof treatment method
A technology of waterproofing and sub-compartment joints, which is applied to building roofs and roof coverings, etc., can solve the problems of damaging the waterproof ability of oil glue, water seepage through sub-compartment joints, cracking and seepage, and achieve the effect of making up for cracking and cracking
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] The construction method of the waterproof covering layer on the sub-compartment joints: first, clean the two sides of the sub-compartment joints before applying water-based asphalt, and fill the sub-compartment joints with caulking ointment (slightly higher than the plane by about 1mm), and then Brush the 30cm wide water-based asphalt paint (thickness: 0.2-0.4mm) thinly on the joints of the bins, and evenly coat a layer of 0.7-1.0mm thick water-based asphalt paint after drying. Before the second layer of water-based asphalt paint is completely dry, lay the plastic cavity flat and paste it in the center along the slits of the bins, cover it with glass mesh cloth and evenly brush a layer of water-based asphalt paint with a thickness of about 0.7-1.0mm. After it is completely dry, apply a layer of water-based asphalt paint with a thickness of about 1.0-1.5mm evenly, so that the construction of the waterproof covering layer on the joints of the sub-bins is basically complete...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 