Switching back method after failure of relay switching
A relay switching, physical layer technology, applied in the direction of electrical components, synchronization devices, radio/induction link selection and arrangement, etc., can solve the problems of RRC misjudgment, RRC wrong action, etc., to save the switchback speed and avoid RRC wrong action. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] The core of the present invention is that during the relay handover process of the UE, if the UE RRC detects that the physical layer has not been synchronized within the specified time, it will perform a switchback operation, and the specified physical layer will be activated immediately, and the uplink and downlink will be activated simultaneously . In order to enable the UE to re-establish synchronization with the original cell after the handover and continue to perform various measurements before the handover, the UE keeps recording the synchronization deviation parameters between the UE and each neighboring cell and the measurement control message configured by the network side during the handover process. When the handover of the UE fails and the switchback configuration is performed, RRC can invert the recorded synchronization deviation parameter and configure it to the physical layer, and then RRC (radio resource control) waits for the switchback synchronization i...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com