Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

38results about How to "Avoid complex work" patented technology

Self-adoptive correcting device of mismatch error of time-interleaved analog-digital converter

InactiveCN101888247AAvoid problems that are difficult to convert to hardware circuitsThere is no problem of implementation deviationAnalogue-digital convertersAnalogue/digital conversion calibration/testingTime errorDigital down converter
The invention discloses a self-adoptive correcting device of mismatch error of time-interleaved analog-digital converter, comprising an M channel TIADC, a signal recombination, a digital reference signal memorizer, a simulated reference signal generator, a self-adaptive reconstruction filter bank, a clock generation circuit and a subtraction device. Signals after passages are reconstructed are used to correct each passage instead of single correction on each passage, thereby solving the problem that when an input signal bandwidth is larger than the Nyquist frequency of each passage ADC, the time error can not be corrected due to aliasing. Each self-adoptive reconstruction filter is divided into a plurality of sub-filters for concurrent working, thereby not improving the requirement of thetreatment speed for a self-adoptive correcting filter while realizing the effect of signal recombination and ensuring the practicability of the hardware of the structure of the invention. A digital reference signal is internally installed in the device and is taken as a target to carry out the self-adoptive correction, pre-measuring or calculating a passage mismatch error is not needed, and the source of the error is not needed to be discriminated so that various mismatch errors can be corrected.
Owner:BEIJING UNIV OF TECH

Simple cascading camera chain measuring method and system for monitoring multipoint settlement

The invention relates to an automatic simple cascading camera chain monitoring method and system. The system is formed by serially connecting a plurality of measuring units, wherein each measuring unit consists of a camera and a cooperation mark which is fixedly connected with the camera. A measuring unit is arranged at each position to be measured in the region along the line, each settlement to-be-measured point is connected with a plurality of settlement known control points, the camera is required to simultaneously photograph two cooperation marks on the left side or the right side in the measuring process, and the settling volume of each mark and pitch angle of each camera can be directly calculated by virtue of the fixed connection constraint of the camera and the mark in each measuring unit and the geometric constraint relation of each homonymous mark imaging of adjacent cameras. According to the method, one camera only needs to be fixedly connected with single mark point and the relation between the camera and the mark point does not need to be calibrated, thereby avoiding the complicated operation for precisely determining the relative relation among multiple cameras and between the cameras and the fixedly connected multiple control points. The method can be used for automatically monitoring the settlement of roadbeds, bridges and the like and has important theoretical research significance and wide application prospect.
Owner:NAT UNIV OF DEFENSE TECH

Swimming pool type regional low-temperature heat supply reactor

The invention belongs to the technical field of reactors, and particularly relates to a swimming pool type regional low-temperature heat supply reactor which comprises a reactor core and a loop. The reactor core is arranged at the bottom of a reactor pool, and the depth of pool water in the reactor pool is 20-30 meters; an upper hanging basket, a middle hanging basket, a lower hanging basket and areactor core base are sequentially arranged in the reactor pool from top to bottom; drive wires of a control rod drive mechanism are arranged in the upper hanging basket, control rod guide barrels are arranged in the middle hanging basket, the reactor core is arranged in the lower hanging basket, the lower hanging basket is arranged on the upper side of the reactor core base which is fixed to thebottom surface of the reactor pool, and the reactivity of reactors is controlled by control rod clusters; the loop is communicated with the lower hanging basket, and heated pool water in the reactorcore can be delivered to the outside of the reactor pool via the loop, can be subjected to heat exchange and can flow back into the reactor pool. The swimming pool type regional low-temperature heat supply reactor has the advantages of high inherent safety level and reliability, economical efficiency and practicality.
Owner:CHINA INSTITUTE OF ATOMIC ENERGY

Wall unit used for laminated shear wall and construction method using wall unit

The invention relates to a wall unit used for a laminated shear wall and a construction method using the wall unit. The wall unit comprises a steel wire frame, and an insulating layer and a casting layer filled on the steel wire frame, wherein the insulating layer is embedded into the steel wire frame; the casting layer is a prefabricated concrete protective layer arranged on one side of the insulating layer; mounting fixing holes are formed in the outer end face of the prefabricated concrete protective layer; auxiliary pulling fasteners are preburied inside the prefabricated concrete protective layer, and are mounted layer by layer during construction; vertical load-bearing bars are arranged on the inner side of an insulating board, and are connected with the auxiliary pulling fasteners in virtue of pulling fasteners used for anchoring; a casting template is arranged outside the vertical load-bearing bars, and then casting is performed on a cavity between the insulating layer and thetemplate, to form a cast-in-place concrete layer. The vertically adjacent wall units are fixedly connected through fixed parts and bolts, and then setting and casting operations of the template are carried out, the shear wall constructed by using the construction method can greatly simplify the construction process and also has the strength of an integral casting wall, and the requirement of the shear wall is highly met.
Owner:河北晶达建筑科技股份有限公司

Switch forwarding information real-time comparison method based on CSD file

The invention discloses a switch forwarding information real-time comparison method based on a CSD file, and the method comprises the steps: importing and analyzing an SCD file, and obtaining the equipment information of a switch of a whole station; based on MMS communication, obtaining forwarding table information logic node information in real time; importing and analyzing the CSD file, obtaining the switch equipment forwarding configuration information, wherein the switch equipment forwarding configuration information comprises switch forwarding information table sub-elements; carrying out normative verification on the CSD file, and comparing the switch equipment port forwarding configuration list with sub-elements of the switch forwarding information table; and comparing the forwarding table information logic node information with the switch equipment port forwarding configuration list. According to the invention, the real-time comparison of the switch forwarding configuration can be completed rapidly and accurately, the verification work efficiency of the switch configuration is greatly improved, and the method plays a positive role in the operation and maintenance work of an intelligent substation.
Owner:国网江西省电力有限公司超高压分公司 +2

Full sphere annular large visual field moon edge optical imaging object lens

ActiveCN105511060AReduce the pressure of aberration correctionGuaranteed positioning and pointing accuracyMountingsVisual field lossHigh resolution imaging
A full sphere annular large visual field moon edge optical imaging object lens belongs to the technical field of optical design and solves the defects of high manufacture and detection cost of parts and the whole machine of an optical system in the prior art, and the uncertain work stability in the space environment. A first planar mirror combination, a second planar mirror combination, an imaging lens combination, a diaphragm, a piece of detector protection glass, and a detector are coaxially arranged according to a light incident sequence. The second planar mirror combination is arranged in front of the first planar mirror combination and arranged in parallel. The first planar mirror combination includes eight planar mirrors which are circumferentially uniformly distributed around a Z axis. The second planar mirror combination includes eight planar mirrors which are circumferentially uniformly distributed around the Z axis. The planar mirrors in the two planar mirror combinations are corresponding to each other. The optical system is insensitive to a circumlunar satellite orbital altitude. The full sphere annular large visual field moon edge optical imaging object lens has high resolution imaging, high imaging quality, and high pointing accuracy, can suit the high precision attitude location of an airship in a moon reflection spectrum region, and reduces the circumlunar flight satellite attitude location time.
Owner:CHANGCHUN INST OF OPTICS FINE MECHANICS & PHYSICS CHINESE ACAD OF SCI

Topology real-time verification method for process level switch of intelligent substation

PendingCN113660560AThe connection configuration is as expectedThe configuration is as expectedMultiplex system selection arrangementsSmart substationConnection table
The invention discloses a topology real-time verification method for a process level switch of an intelligent substation, and relates to the technical field of intelligent switches in the power industry. The method comprises the steps of obtaining subnet information, equipment information and switch port connection information by analyzing an SCD file; obtaining process layer switch equipment information from the equipment information, and obtaining a process layer switch port expected connection table according to the process layer switch equipment information and the connection information of each port of the switch; establishing MMS communication for all process level switch devices in a switch communication subnet, and acquiring public information logic node information and neighbor information logic node information of each port of all process level switch devices under the same subnet in real time; according to the neighbor information logic node information of each port, obtaining real-time actual connection relation information of the process layer switch equipment; and according to the real-time actual connection relation information of the process layer switch equipment, judging whether sub-network division and switch interfaces are wrong, thereby completing process layer switch topology real-time verification.
Owner:ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD +1

Equipment record processing method and device, computer equipment and storage medium

The invention puts forward an equipment record processing method and device, computer equipment and a storage medium. The method comprises the following steps that: according to a sensor measurement value in each equipment record, generating a first feature vector in a first vector space, and according to the maintenance description in each equipment record, generating a second feature vector in asecond vector space; according to a mapping relationship between the first vector space and the second vector space, determining a first mapping vector and a second mapping vector; selecting the second mapping vector, adding the second mapping vector into the first vector set of the first feature vector, selecting the first mapping vector, and adding the first mapping vector into a second vectorset which contains the second feature vector; clustering vectors in the first vector set and the second vector to obtain a first target cluster and a second target cluster; and combining similar clusters in the first target cluster and the second target cluster, and determining a category to which the equipment record belongs. Through the method, an information amount can be increased, and a defect that available features in the equipment record are insufficient is made up.
Owner:NEUSOFT CORP

A minimalist series camera chain measurement method and system for monitoring multi-point settlement

The invention relates to an automatic simple cascading camera chain monitoring method and system. The system is formed by serially connecting a plurality of measuring units, wherein each measuring unit consists of a camera and a cooperation mark which is fixedly connected with the camera. A measuring unit is arranged at each position to be measured in the region along the line, each settlement to-be-measured point is connected with a plurality of settlement known control points, the camera is required to simultaneously photograph two cooperation marks on the left side or the right side in the measuring process, and the settling volume of each mark and pitch angle of each camera can be directly calculated by virtue of the fixed connection constraint of the camera and the mark in each measuring unit and the geometric constraint relation of each homonymous mark imaging of adjacent cameras. According to the method, one camera only needs to be fixedly connected with single mark point and the relation between the camera and the mark point does not need to be calibrated, thereby avoiding the complicated operation for precisely determining the relative relation among multiple cameras and between the cameras and the fixedly connected multiple control points. The method can be used for automatically monitoring the settlement of roadbeds, bridges and the like and has important theoretical research significance and wide application prospect.
Owner:NAT UNIV OF DEFENSE TECH

A construction method using wall units for laminated shear walls

The invention relates to a wall unit used for a laminated shear wall and a construction method using the wall unit. The wall unit comprises a steel wire frame, and an insulating layer and a casting layer filled on the steel wire frame, wherein the insulating layer is embedded into the steel wire frame; the casting layer is a prefabricated concrete protective layer arranged on one side of the insulating layer; mounting fixing holes are formed in the outer end face of the prefabricated concrete protective layer; auxiliary pulling fasteners are preburied inside the prefabricated concrete protective layer, and are mounted layer by layer during construction; vertical load-bearing bars are arranged on the inner side of an insulating board, and are connected with the auxiliary pulling fasteners in virtue of pulling fasteners used for anchoring; a casting template is arranged outside the vertical load-bearing bars, and then casting is performed on a cavity between the insulating layer and thetemplate, to form a cast-in-place concrete layer. The vertically adjacent wall units are fixedly connected through fixed parts and bolts, and then setting and casting operations of the template are carried out, the shear wall constructed by using the construction method can greatly simplify the construction process and also has the strength of an integral casting wall, and the requirement of the shear wall is highly met.
Owner:河北晶达建筑科技股份有限公司

Environment-friendly dust-collector on construction site

The invention discloses an environment-friendly dust-collector on a construction site, which comprises a No. 1 dust-collector, a No. 2 dust-collector, and a No. 3 dust-collector, the No. 1 dust-collector, the No. 2 dust-collector and the No. 3 dust-collector are fixedly installed on various positions requiring dust-collection on the construction site to realize water-spraying and dust-collection at various positions on the construction site, with obviously improved dust-collection covering range, each dust-collector is connected via a water conveying pipe to realize that operation of multipledust-collectors are served by a single water conveying pipe on the construction site, the water conveying pipe is provided with a booster pump to ensure the pressure and velocity of the water flow entering a next dust-collector, and water conveyed by a water conveying pipe in a support cylinder enters a water delivery pipe in a water-spraying device, to be conveyed to a No. 1 water-spraying pipe,a No. 2 water-spraying pipe, and a No. 3 water-spraying pipe, and is finally sprayed upwards through high-pressure sprayers of the No. 1 water-spraying pipe, the No. 2 water-spraying pipe, and the No.3 water-spraying pipe. The environment-friendly dust-collector has the advantages of simple structure, strong practicability, convenient operation, and easy use and promotion.
Owner:王世华

Planar intersection timing signal timing method of superposed phase

The invention discloses a planar intersection timing signal timing method of a superposed phase in the field of urban road traffic control. The method comprises the following steps of: calculating a flow ratio at each entrance in each flow direction; determining a conflict point with larger flow ratio sum in one flow direction as a key conflict point; determining a vehicle flow combination corresponding to the key conflict point as a key vehicle flow group, wherein key vehicle flow groups in two flow directions of an intersection form a key flow chain; calculating cycle time length of the keyflow chain according to a formula; distributing green light time length for a vehicle flow in each flow direction; and finally calculating green light display time length of the vehicle flow in each direction according to the formula and determining a phase superposition scheme. In the method, the scientific and accurate phase superposition scheme can be automatically generated according to a calculated timing result, the saturation of the vehicle flow can be controlled by adjusting parameters in the formula, the saturation of the vehicle flow in each direction is freely set, the cycle time length is adjusted, the preference of a vehicle flow signal in a certain direction is convenient to realize, and the traffic capacity of the intersection and the service level of the vehicle flow are improved.
Owner:JIANGSU UNIV

Establishment method and system of electricity stealing user prediction model, storage medium and equipment

The invention provides an electricity stealing user prediction model establishment method and system, a storage medium and equipment, and the method comprises the steps: obtaining the power utilization data of a plurality of users and the power grid operation data of a transformer area where the users belong, extracting all features, carrying out the correlation analysis between all features and whether the users steal electricity or not, and obtaining a prediction result, and obtaining all characteristics of a user, screening out associated characteristics with high correlation with whether the user steals electricity from all the characteristics; making an electricity stealing training table of each user according to the associated characteristics of each user and a corresponding data value, and classifying and marking the electricity stealing training table of each user according to an electricity stealing result of whether the user steals electricity so as to obtain the electricity stealing training table marked with an electricity stealing code or a non-electricity stealing code; and making an electricity stealing training set according to the electricity stealing training tables marked by all users in a classified mode, and inputting the electricity stealing training set into an initial prediction model to be trained so as to obtain a pre-trained prediction model. The prediction model can be used for rapidly and accurately predicting whether the user steals electricity or not.
Owner:TELLHOW SOFTWARE

Device record processing method, device, computer device and storage medium

The present invention proposes an equipment record processing method, device, computer equipment, and storage medium, wherein the method includes: generating a first feature vector in the first vector space according to sensor measurement values ​​in each equipment record, and generating a first feature vector in the first vector space according to each equipment record According to the maintenance description in the second vector space, the second eigenvector in the second vector space is generated; according to the mapping relationship between the first vector space and the second vector space, the first mapping vector and the second mapping vector are determined; the second mapping vector is selected Add to the first vector set containing the first feature vector, select the first mapping vector to add to the second vector set containing the second feature vector; cluster the vectors in the first vector set and the second vector set Obtaining the first and second target clusters; combining similar clusters in the first target cluster and the second target cluster, and determining the category to which the device record belongs. Through this method, the amount of information can be increased, and the disadvantage of insufficient available features in the equipment record can be made up for.
Owner:NEUSOFT CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products