This crimping connection method requires high connection technology. The connection part is the port of the
nozzle, and the connection contact surface is small. The two ports are easy to cause radial
relative displacement, resulting in misplaced connection. After a long
time of use, leakage is easy to occur. In fact, no matter how high-quality connection is installed, the split air conditioner will leak a certain amount of refrigerant every year, and it needs to be filled regularly, otherwise the
cooling capacity will continue to decline. It is based on the technology brought by this connection method due to structural shortcomings
For a long time, this has become a technical problem that technicians in related fields have been eager to solve, and have proposed many improved technical solutions for this reason, such as adding a sealing ring between the
bell mouth and the port of the connecting
pipe of the stop valve; changing The shape of the crimping surface expands the crimping area; double bell mouths are used to compress and seal the connection, etc., but the problem of easy leakage is caused by this connection method, so its shortcomings of easy leakage have not been fundamentally changed
There is also an improved technical scheme of applying
sealant on the port of the stop valve connecting pipe, but since the
bell mouth is still used to connect the port of the stop valve connecting pipe by crimping, one is that the sealing surface of the port is too small , the second is for sealing, the lama mouth needs to be compressed, which will damage the
sealant coating, because the compression nut of this connection method is inserted into the connecting pipe through the screw hole, and the compression seal is the connection tube
bell mouth, the nut There is a gap between the nut and the refrigerant connecting pipe. After a long time, the
sealant will lose its sealing effect, and the leaked refrigerant will leak out through the gap between the nut and the refrigerant connecting pipe. The leakage problem is also impossible to get Eliminate
In order to reduce production costs, in recent years, there has been a technical solution to replace
copper connecting pipes with aluminum
alloy connecting pipes. In this way, the ports of the connecting pipes between the Lama port and the stop valve are changed from the original connection between copper and copper to the connection between aluminum and copper. The contact connection between the connecting pipes will generate a
potential difference between the copper and aluminum, which will inevitably cause
electrochemical corrosion, resulting in poor sealing of the connection parts of the copper and aluminum pipes, and finally causing the refrigerant leakage problem to become more serious.
Therefore, in response to this problem, there has been a technical solution to replace the copper connecting pipe with a copper-aluminum welded composite pipe. The two ends of the connecting pipe are still copper pipes, and the longer part in the middle is an aluminum pipe, which maintains the connection between the copper connecting pipe and the
cut-off pipe. The connection of the connecting pipe of the valve is still the connection between the copper and the copper, but because the
welding between the two copper pipes and the aluminum pipe in the middle is still the contact connection between the aluminum and the copper, it will also cause
electrochemical corrosion and damage Finally, the problem of refrigerant leakage will arise. At the same time, due to the increase of the
welding process and the increase of production costs, only in terms of welding technology, it will also cause a certain degree of leakage. This connection method also has a
disadvantage, the pressure
Copper nuts are still required for tight connection nuts, otherwise there will still be problems of electrochemical
corrosion, and the purpose of obtaining copper connecting pipes for all-aluminum aluminum alloy refrigerant connecting pipes cannot be achieved
Therefore, people have proposed many improvement measures again to this again, as galvanizing the welding place,
coating anticorrosion agent, socketing plastic casing, spraying one layer of plastic-sprayed layer, wrapping heat-shrinkable tube etc., this is just to welding The
radial surface of the part has been treated, but the welding part of the copper-aluminum tube will still produce a
potential difference through the welding part, and the problem of electrochemical
corrosion still exists. In addition, when the indoor and outdoor units are relatively far away, the refrigerant connecting pipe needs to To lengthen, the usual method is to
cut and separate the existing refrigerant connecting pipe, add the connecting pipe of the required length, and then weld it
Due to the thinness of the refrigerant connecting pipe, it is difficult to ensure the quality of on-site welding, which brings the quality hidden danger of easy leakage for the use of air conditioners