Check patentability & draft patents in minutes with Patsnap Eureka AI!

External pre-stress construction method for chamber type bridge maintaining

A technology of external prestressing and construction methods, applied in bridge maintenance, bridges, bridge reinforcement, etc., can solve the problems that new poured concrete cannot be used for anchorage, etc., and achieve the effect of simple construction and strong reliability

Inactive Publication Date: 2010-06-02
CHINA FIRST METALLURGICAL GROUP
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing external cables are directly anchored to the transverse partition wall, or anchored by newly poured concrete; when the transverse partition wall is too thin to fully bear the force of the external cable, or when there is no anchoring space behind the transverse partition wall, it is necessary to separately design the anchor block to bear the force; When the concrete transportation is inconvenient, the newly poured concrete cannot be used for anchoring; and when the beam body has been cracked, the moisture of the newly poured concrete is easy to enter the beam body and corrode the steel bars and prestressed steel strands (or steel bars) in the beam body, so it cannot be used. Freshly poured concrete anchoring
Existing external prestressing construction methods have limitations

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • External pre-stress construction method for chamber type bridge maintaining
  • External pre-stress construction method for chamber type bridge maintaining
  • External pre-stress construction method for chamber type bridge maintaining

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] A large bridge in Wuhan was repaired using external prestressing technology to strengthen the bridge. A total of 40 external cables were designed. figure 1 , figure 2 , image 3 , Figure 4 shown, Note: there are more than these three types of external cable arrangement).

[0041] External prestressed layout form:

[0042] 1, 13 # ~16 # External prestressed layout of the upper and lower boxes of the continuous rigid structure of the pier:

[0043] (1), 13 # ~16 # The external prestressed beams of the pier continuous rigid structure, 83m span and 130m span, arrange 4 beams in each box room. 8 bundles are arranged at a span of 125m, of which 4 bundles and 4 bundles at a span of 130m are common bundles.

[0044] (2), such as image 3 As shown, the 83m span outer bundle is at 16 # Fixed at the bottom plate of the pier support (anchor end), passing through 15 # Pier top diaphragm, at 15 # One end of the pier is tensioned and anchored (tensioned end).

[0045] ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an external prestressing construction method for box bridge maintenance, which is characterized in that: 1). The position of an anchor block, a redirector and a shock absorberare decided according to external cable arranging mode for external prestressing; 2). The installation of the anchor block: 2.1). concrete base surface processing; 2.2). hole drilling, hole cleaning and reinforcing bar planting; 2.3). the installation of steel-bonded steel plate: the anchor block comprises a steel-bonded steel plate, a connecting plate and a stiffening plate; all anchor bolts arepenetrated through a corresponding fixing hole on the steel-bonded steel plate; 2.4). the installation of other steel plates for the anchor block; the connecting plate is welded with the steel-bondedsteel plate, the stiffening plate is welded with the steel-bonded steel plate and is provided with a through hole for external cable; 2.5). glue pouring for the steel-bonded steel plate: glue pouringis made between the steel-bonded steel plate and the concrete base surface for the anchor block; 3). Horizontal partition wall perforation; 4). The installation of a redirecting support and a dampingsupport; 5). The installation of the redirector; 6). Penetrating and tension of prestressing steel strand; 7). The installation of the shock absorber. The invention has the advantages of convenient construction, flexibility and stronger reliability.

Description

technical field [0001] The invention relates to an external prestressing construction method for box bridge maintenance. Background technique [0002] In order to limit the continued deflection of the beam body and increase the compressive stress reserve of the section, external cables are generally installed as one of the main measures to solve the deflection of the beam body during maintenance of box bridges. The existing external cables are directly anchored to the transverse partition wall, or anchored by newly poured concrete; when the transverse partition wall is too thin to fully bear the force of the external cable, or when there is no anchoring space behind the transverse partition wall, it is necessary to separately design the anchor block to bear the force; When the concrete transportation is inconvenient, the newly poured concrete cannot be used for anchoring; and when the beam body has been cracked, the moisture of the newly poured concrete is easy to enter the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D22/00E01D2/04
Inventor 郑泽武张海峰王春兰林宗辉
Owner CHINA FIRST METALLURGICAL GROUP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More