Prestress pulling resistant anchor pile and constructing method thereof
A construction method and a technology of anti-uplift anchors, which are applied to sheet pile walls, foundation structure engineering, protection devices, etc., can solve problems such as poor mechanical performance of anti-uplift anchor piles, achieve strong practicability, improve mechanical performance, good social benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] Describe in detail below in conjunction with accompanying drawing.
[0031] The foundation project of a boiler room in a water plant is 18m wide from north to south and 21.6m long from east to west, all placed underground, with 2 floors in total. The structure type is a frame structure, the thickness of the foundation plate is 800mm, and the depth and elevation of the foundation are -9.6m. Considering the high groundwater in this area, the weight of the underground boiler room itself cannot resist the buoyancy of the groundwater. In order to solve the problem of anti-uplift of buildings, prestressed anti-uplift anchor piles are used to make the cement mixing piles, high-strength cement slurry, and steel strands bear the overall force, which improves the mechanical performance of the anti-uplift anchor piles, so as to achieve the overall strength of the building. The purpose of pulling out.
[0032] The cement mixing pile is formed by the cement mixer drilling rig. Aft...