Drilling construction method for dry rock-socketed bored pile
A construction method and drilling pile technology, which are applied in drilling equipment and methods, sheet pile walls, drilling equipment, etc., to achieve the effects of low drilling risk, easy quality assurance, and reduction of repeated impact of drilling rigs on drilling slag.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] As shown in the figure, a drilling method for dry-placed rock-socketed bored piles includes the following steps:
[0020] 1. Guide pile digging construction. The manual excavation pile construction method is adopted, and the construction depth of the guide pile shall be determined according to the geological conditions. Generally, the depth of the guide pile is not less than 2 meters, and the complete bedrock embedded is not less than 2 meters.
[0021] 2. The drilling rig is in place. Use a percussion drill for drilling. Determine the weight of the drill bit according to the diameter of the pile, pour 10cm thick concrete within 1 meter of the front of the drilling rig and level off the installation area of the drilling rig, and install the drilling rig after the concrete reaches 7 days of age. shaking.
[0022] 3. Slurry drilling
[0023] Drilling slurry is used to put clay into the hole in stages, inject water into the hole at the same time, and start the drilli...